Technical–Economic Limits and Block-Level Development Sequencing for Production Replacement in a Mature High-Water-Cut Oilfield

Production replacement in mature high-water-cut oilfields requires decisions about how long existing units can continue operating and when replacement stages should enter production. This study examined these decisions in the Xingbei Development Area of the Daqing Oilfield. Economic screening used a 120-month forecast of water cut and oil production for X7 Central 3. Annual waterflood and tertiary oil production forecasts were used to compare four development scenarios for 30 candidate blocks over 2026–2066. The baseline economic water-cut limit was 98.0151%, and cumulative operating contribution reached its maximum at month 120, the last month evaluated. A simultaneous 20% decrease in effective net oil revenue and 20% increase in produced-liquid cost moved this maximum to month 68. The staged upward-transfer scenario (S3) had the highest cumulative total oil production and the smallest mean absolute annual production change. The technology-maturity-guided scenario (S4) produced 3.07% more oil per year on average than S3 during 2051–2066 and had the highest production in 2066. An alternative harmonic decline reference reversed the cumulative shortfall ranking of S3 and S4. These results support selecting a development sequence according to the production objective, assessment period, and benchmark.

Authors

Institutions

Publication Details

Journal
Processes
Published
2026-11-27
DOI
https://doi.org/10.3390/pr14233827
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Technical–Economic Limits and Block-Level Development Sequencing for Production Replacement in a Mature High-Water-Cut Oilfield

Daiyin Yin, Wang Dongqi, Yashe Guo, Jiaxing Wen et al.
Processes
Reservoir Engineering and Simulation Methods
article

Technical–Economic Limits and Block-Level Development Sequencing for Production Replacement in a Mature High-Water-Cut Oilfield

Daiyin Yin, Wang Dongqi, Yashe Guo, Jiaxing Wen, Fang Ma
article en

Abstract

Production replacement in mature high-water-cut oilfields requires decisions about how long existing units can continue operating and when replacement stages should enter production. This study examined these decisions in the Xingbei Development Area of the Daqing Oilfield. Economic screening used a 120-month forecast of water cut and oil production for X7 Central 3. Annual waterflood and tertiary oil production forecasts were used to compare four development scenarios for 30 candidate blocks over 2026–2066. The baseline economic water-cut limit was 98.0151%, and cumulative operating contribution reached its maximum at month 120, the last month evaluated. A simultaneous 20% decrease in effective net oil revenue and 20% increase in produced-liquid cost moved this maximum to month 68. The staged upward-transfer scenario (S3) had the highest cumulative total oil production and the smallest mean absolute annual production change. The technology-maturity-guided scenario (S4) produced 3.07% more oil per year on average than S3 during 2051–2066 and had the highest production in 2066. An alternative harmonic decline reference reversed the cumulative shortfall ranking of S3 and S4. These results support selecting a development sequence according to the production objective, assessment period, and benchmark.

ProcessesVol. 14(23)
Northeast Petroleum University (CN)
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon