Technical–Economic Limits and Block-Level Development Sequencing for Production Replacement in a Mature High-Water-Cut Oilfield
Production replacement in mature high-water-cut oilfields requires decisions about how long existing units can continue operating and when replacement stages should enter production. This study examined these decisions in the Xingbei Development Area of the Daqing Oilfield. Economic screening used a 120-month forecast of water cut and oil production for X7 Central 3. Annual waterflood and tertiary oil production forecasts were used to compare four development scenarios for 30 candidate blocks over 2026–2066. The baseline economic water-cut limit was 98.0151%, and cumulative operating contribution reached its maximum at month 120, the last month evaluated. A simultaneous 20% decrease in effective net oil revenue and 20% increase in produced-liquid cost moved this maximum to month 68. The staged upward-transfer scenario (S3) had the highest cumulative total oil production and the smallest mean absolute annual production change. The technology-maturity-guided scenario (S4) produced 3.07% more oil per year on average than S3 during 2051–2066 and had the highest production in 2066. An alternative harmonic decline reference reversed the cumulative shortfall ranking of S3 and S4. These results support selecting a development sequence according to the production objective, assessment period, and benchmark.
Authors
- Daiyin Yin (ORCID: https://orcid.org/0000-0002-9968-9412)
- Wang Dongqi (ORCID: https://orcid.org/0000-0001-9224-7032)
- Yashe Guo (ORCID: https://orcid.org/0009-0002-3347-976X)
- Jiaxing Wen
- Fang Ma
Institutions
- Northeast Petroleum University (CN)
Publication Details
- Journal
- Processes
- Published
- 2026-11-27
- DOI
- https://doi.org/10.3390/pr14233827
- Primary Topic
- Reservoir Engineering and Simulation Methods
- Type
- article
- Field-Weighted Citation Impact
- 0.00