Increasing HRSG Efficiency with the Bang & Clean Method Using Controlled Pressure Waves
HRSG (Heat Recovery Steam Generator) is a vital component used in the electricity generation process at a PLTGU. During operation, fouling on the HRSG tubes can binder heat transfer and reduce system performance. At PT. Cikarang Listrindo Tbk.-PLTGU Jababeka it takes approximately 2-3 weeks for manual cleaning. This has led to the implementation of the Bang & Clean innovation, which requires less time than manual cleaning. This operational bottleneck prompted the implementation of the Bang & Clean method, which significantly reduces maintenance duration to only 3–4 days. The research employed a descriptive method using data from the HRSG tube cleaning activities conducted in 2023. The results showed improvements in GTG (Gas Turbine Generator) performance and HRSG efficiency, an increase in STG (Steam Turbine Generator) power output, and a reduction in heat consumption. Overall performance also improved, as evidenced by a decrease in heat rate from 11,766.75 to 11,683.28 BTU/kWh and an increase in the system’s overall efficiency from 29% to 29.20%. Emissions calculations based on generated energy, emission factors, and the assumption of constant energy efficiency percentages until the next scheduled maintenance show a reduction of 2,358.42 tonCO₂eq in 2023, 3,582.22 tonCO₂eq in 2024, and 945.73 tonCO₂eq in 2025, resulting in a total emissions reduction of 6,886.37 tonCO₂eq from 2023 to 2025.
Authors
- Carolina Dewi
- Ariq Ahnafalah Syakban
- Pariyanto
- Muhammad Afin Al Basyar
Publication Details
- Journal
- ENVIBILITY Journal of Environmental and Sustainability Studies
- Published
- 2026-11-27
- DOI
- https://doi.org/10.55381/envibility.v4i2.712
- Primary Topic
- Advanced Power Generation Technologies
- Type
- article
- Field-Weighted Citation Impact
- 0.00