From point clouds to bench geometry: Automated 3D step breakline extraction and volumetric analysis using ensemble feature detection and multi-method curve fitting

Automatic extraction of three-dimensional step breaklines (toe and crest lines) from point clouds is essential for open-pit mine design and slope stability assessment, yet existing methods often suffer from incomplete detection and over-segmentation because of their reliance on single edge operators and fixed curve-fitting strategies. This study presents a fully automated framework integrating: (i) adaptive Residual-Corrected Adaptive Inverse Distance Weighting (RC-AIDW) interpolation for Digital Elevation Model (DEM) generation at Adaptive Spatial Nyquist-based DEM Resolution (ASND)-derived resolutions (0.1–0.4 m); (ii) an entropy-weighted ensemble of seven complementary edge detectors; and (iii) systematic multi-method curve fitting with multi-criteria decision analysis-based model selection and automated per-bench volumetric estimation. The framework was validated using six multi-temporal point clouds (>145 million points) from three independent open-pit mines in Iran and Switzerland. The ensemble increased detected feature points by 49–67% compared with the Sobel operator while maintaining mean uncertainty below 0.0003. Among the evaluated fitting methods, B-spline achieved the highest accuracy, with root mean square error (RMSE) values of 0.2096, 0.0467, and 0.1044 m for Mines 1–3, respectively. Compared with commercial software Global Mapper, the proposed approach reduced segment count by 97.4–99.5% and total breakline length by 72–82%, while producing smooth engineering-ready breaklines and enabling automated estimation of per-bench volumes. The results demonstrate robust generalizability across diverse geological and environmental conditions, confirming the framework's suitability for routine open-pit production monitoring.

Authors

Institutions

Publication Details

Journal
Mining Technology Transactions of the Institutions of Mining and Metallurgy
Published
2026-11-27
DOI
https://doi.org/10.1177/25726668261506309
Primary Topic
Geodetic Measurements and Engineering Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

From point clouds to bench geometry: Automated 3D step breakline extraction and volumetric analysis using ensemble feature detection and multi-method curve fitting

Amir Sarvi, Abbas Abedini, Farzaneh Dadrass Javan
Mining Technology Transactions of the Institutions of Mining and Metallurgy
Geodetic Measurements and Engineering Structures
article

From point clouds to bench geometry: Automated 3D step breakline extraction and volumetric analysis using ensemble feature detection and multi-method curve fitting

Amir Sarvi, Abbas Abedini, Farzaneh Dadrass Javan
article en

Abstract

Automatic extraction of three-dimensional step breaklines (toe and crest lines) from point clouds is essential for open-pit mine design and slope stability assessment, yet existing methods often suffer from incomplete detection and over-segmentation because of their reliance on single edge operators and fixed curve-fitting strategies. This study presents a fully automated framework integrating: (i) adaptive Residual-Corrected Adaptive Inverse Distance Weighting (RC-AIDW) interpolation for Digital Elevation Model (DEM) generation at Adaptive Spatial Nyquist-based DEM Resolution (ASND)-derived resolutions (0.1–0.4 m); (ii) an entropy-weighted ensemble of seven complementary edge detectors; and (iii) systematic multi-method curve fitting with multi-criteria decision analysis-based model selection and automated per-bench volumetric estimation. The framework was validated using six multi-temporal point clouds (>145 million points) from three independent open-pit mines in Iran and Switzerland. The ensemble increased detected feature points by 49–67% compared with the Sobel operator while maintaining mean uncertainty below 0.0003. Among the evaluated fitting methods, B-spline achieved the highest accuracy, with root mean square error (RMSE) values of 0.2096, 0.0467, and 0.1044 m for Mines 1–3, respectively. Compared with commercial software Global Mapper, the proposed approach reduced segment count by 97.4–99.5% and total breakline length by 72–82%, while producing smooth engineering-ready breaklines and enabling automated estimation of per-bench volumes. The results demonstrate robust generalizability across diverse geological and environmental conditions, confirming the framework's suitability for routine open-pit production monitoring.

Mining Technology Transactions of the Institutions of Mining and Metallurgy
University of Tehran (IR), University of Twente (NL)
Geodetic Measurements and Engineering Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon