Occurrence of a Large Temporary Overvoltage Due to a Phase Interruption in a 220 kV Line

The paper details the occurrence of a severe temporary overvoltage (TOV) in an existing Italian HV/MV system where a radially operated 180 km, 220 kV overhead line experienced an asymmetrical phase conductor break. The recorded TOV reached 1.43 p.u. (256 kV peak line-to-ground) and 1.41 p.u. (440–445 kV peak line-to-line) at the 220 kV level, transferring a 1.38 p.u. (45 kV peak) overvoltage to the underlying 23 kV MV network and causing customer equipment damage, exceeding standard EHV/HV insulation coordination duration limits. Series faults, liable to cause overvoltages in radial systems, are not uncommon at MV level and have been extensively investigated in the past. Such radial configurations, although much less frequently, can occur also at HV level due to contingencies, maintenance or both. An approximate linear circuit model is presented to explain the underlying series resonance mechanism with the transformer zero-sequence magnetizing impedance. Furthermore, a detailed nonlinear ATP-EMTP system model was developed. Simulation results show excellent quantitative agreement with field recordings (peak error < 2.0%), confirming that transformer core saturation limits the theoretical resonant peak and that local generation restoration effectively suppresses the TOV.

Authors

Institutions

Publication Details

Journal
Energies
Published
2026-11-27
DOI
https://doi.org/10.3390/en19235754
Primary Topic
High-Voltage Power Transmission Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Occurrence of a Large Temporary Overvoltage Due to a Phase Interruption in a 220 kV Line

Luigi D'Orazio, Marco Maccioni, A. Geri, Tommaso Bragatto et al.
Energies
High-Voltage Power Transmission Systems
article

Occurrence of a Large Temporary Overvoltage Due to a Phase Interruption in a 220 kV Line

Luigi D'Orazio, Marco Maccioni, A. Geri, Tommaso Bragatto, Leandro Caciolli, Enrico Maria Carlini, Alberto Cerretti, Gaetano Pecoraro, Fabio Massimo Gatta, Stefano Lauria
article en

Abstract

The paper details the occurrence of a severe temporary overvoltage (TOV) in an existing Italian HV/MV system where a radially operated 180 km, 220 kV overhead line experienced an asymmetrical phase conductor break. The recorded TOV reached 1.43 p.u. (256 kV peak line-to-ground) and 1.41 p.u. (440–445 kV peak line-to-line) at the 220 kV level, transferring a 1.38 p.u. (45 kV peak) overvoltage to the underlying 23 kV MV network and causing customer equipment damage, exceeding standard EHV/HV insulation coordination duration limits. Series faults, liable to cause overvoltages in radial systems, are not uncommon at MV level and have been extensively investigated in the past. Such radial configurations, although much less frequently, can occur also at HV level due to contingencies, maintenance or both. An approximate linear circuit model is presented to explain the underlying series resonance mechanism with the transformer zero-sequence magnetizing impedance. Furthermore, a detailed nonlinear ATP-EMTP system model was developed. Simulation results show excellent quantitative agreement with field recordings (peak error < 2.0%), confirming that transformer core saturation limits the theoretical resonant peak and that local generation restoration effectively suppresses the TOV.

EnergiesVol. 19(23)
Terna (Italy) (IT), Huawei Technologies (Germany) (DE), Sapienza University of Rome (IT)
High-Voltage Power Transmission Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Occurrence of a Large Temporary Overvoltage Due to a Phase Interruption in a 220 kV Line — Luigi D'Orazio, Marco Maccioni, et al. · Energies (2026) | TGRS Research Map | TGRS