Risk Analysis in Transportation Projects Using Monte Carlo Simulation: Connecticut Department of Transportation Case Study

Construction risk analysis is frequently based on expert opinion surveys or hypothetical modeling scenarios, with limited use of implementation-phase documentation from real public infrastructure projects. This study presents an empirical risk analysis of 146 transportation construction projects administered by the Connecticut Department of Transportation, representing approximately $1.5 billion in construction value. The novelty of this research lies in integrating field-documented risk statements recorded during project execution with probabilistic cost modeling using Monte Carlo simulation (MCS). A qualitative content analysis identified 297 risks categorized into nine major groups. For each category, the risk associated with the highest observed cost escalation was modeled using lognormal-based MCS to estimate probabilistic cost variability. Results indicate that construction and design-related risks account for nearly half of all identified risks, while utility relocation, design changes, contractor quality control, and stakeholder concerns were associated with the highest cost increases, ranging from 12% to 22%. Probabilistic modeling demonstrates how these dominant risks contribute to cost uncertainty and contingency requirements. By linking implementation-phase risk documentation with quantitative simulation, this study provides an empirical framework for improving risk-informed budgeting and contingency planning in transportation infrastructure projects.

Authors

Institutions

Publication Details

Journal
Journal of structural design and construction practice.
Published
2026-11-27
DOI
https://doi.org/10.1061/jsdccc.sceng-2245
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Risk Analysis in Transportation Projects Using Monte Carlo Simulation: Connecticut Department of Transportation Case Study

Byungik Chang, Muhammad Rauf Shaker, Cliff J. Schexnayder
Journal of structural design and construction practice.
Construction Project Management and Performance
article

Risk Analysis in Transportation Projects Using Monte Carlo Simulation: Connecticut Department of Transportation Case Study

Byungik Chang, Muhammad Rauf Shaker, Cliff J. Schexnayder
article en

Abstract

Construction risk analysis is frequently based on expert opinion surveys or hypothetical modeling scenarios, with limited use of implementation-phase documentation from real public infrastructure projects. This study presents an empirical risk analysis of 146 transportation construction projects administered by the Connecticut Department of Transportation, representing approximately $1.5 billion in construction value. The novelty of this research lies in integrating field-documented risk statements recorded during project execution with probabilistic cost modeling using Monte Carlo simulation (MCS). A qualitative content analysis identified 297 risks categorized into nine major groups. For each category, the risk associated with the highest observed cost escalation was modeled using lognormal-based MCS to estimate probabilistic cost variability. Results indicate that construction and design-related risks account for nearly half of all identified risks, while utility relocation, design changes, contractor quality control, and stakeholder concerns were associated with the highest cost increases, ranging from 12% to 22%. Probabilistic modeling demonstrates how these dominant risks contribute to cost uncertainty and contingency requirements. By linking implementation-phase risk documentation with quantitative simulation, this study provides an empirical framework for improving risk-informed budgeting and contingency planning in transportation infrastructure projects.

Journal of structural design and construction practice.Vol. 32(2)
University of New Haven (US), Arizona State University (US)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon