PAYMENT MANAGEMENT CHALLENGES AFFECTING CONTRACTOR EFFICIENCY IN MALAYSIAN PUBLIC CONSTRUCTION PROJECTS: A QUALITATIVE STUDY OF INTERIM PAYMENT PROCESSES
Malaysia’s construction sector plays a significant role in economic development and infrastructure delivery; however, payment challenges continue to affect contractor efficiency, particularly cash flow, and project progress. This study aimed to identify payment management challenges affecting contractor efficiency in public construction projects, focusing on interim payment processes. A qualitative research approach was adopted through data triangulation involving literature review, document review, and semi-structured interviews. Purposive sampling was used to select 10 public construction projects, with contract documents, payment certificates, and final payment records reviewed. Additionally, 50 expert personnel involved in the selected projects participated in semi-structured interviews. Data were analysed using ATLAS.ti through thematic and co-occurrence analysis to identify recurring payment challenges and relationships among themes. Four main themes emerged: variation orders, purchasing errors, non-compliance, and inefficient payment systems. Frequency and co-occurrence analysis identified pricing discrepancies, incorrect material specifications, changes in materials or specifications, and inaccurate quantity assessments as the most prominent factors affecting payment management. Inadequate documentation, complex payment procedures, incorrect invoicing, and contractual non-compliance also contributed to payment challenges. The findings demonstrated that these challenges were interconnected, resulting in payment discrepancies, additional verification and approval requirements, disputes, administrative delays, and cash flow pressures that reduced contractor efficiency. The study concludes that a standardised and consistent interim payment approach, supported by effective variation order management, accurate procurement and documentation, contractual compliance, timely payment certification, and improved stakeholder communication, is essential to reduce payment delays and disputes, strengthen contractor cash flow, and enhance the efficiency of public construction project delivery.
Authors
- Faridah Muhamad Halil (ORCID: https://orcid.org/0000-0002-0308-9915)
- Norsyakilah Romeli (ORCID: https://orcid.org/0000-0002-1134-1842)
- Muhammad Aizat Afiq Abd Ghapar
- Nurul Atikah Amira Amran
- Fadzliel Aswad Ibrahim
Publication Details
- Journal
- PLANNING MALAYSIA
- Published
- 2026-11-27
- DOI
- https://doi.org/10.21837/pm.v24i45.2446
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00