A comprehensive constructability critical factors performance analysis for project delivery success

The current challenge of the construction industry is the very high increase in infrastructure needs. However, it is limited by resource availability, thus requiring increased productivity, competitiveness, and innovation. One of the efforts made is integrated planning across all project stages, known as constructability. Existing constructability studies have mostly focused on identifying constructability factors and assessing frameworks. Project implementation still faces obstacles because critical factors, such as construction knowledge and experience across planning, engineering, procurement, and field operations, have not been fully identified, even though these factors are essential to achieving overall project objectives. In addition, most constructability studies are limited to determining and validating variables without implementing them in real projects to measure the accuracy of the constructability model. Accordingly, this study develops a model using Importance–Performance Analysis (IPA) and the Relative Importance Index (RII). An initial set of 24 constructability variables was verified by 24 construction industry experts and subsequently refined into 22 variables across three project lifecycle phases. The importance and performance of these 22 variables were then assessed using 15 valid expert responses through IPA and RII. IPA identified five high-importance/low-performance variables as improvement priorities. RII highlighted the planning team's knowledge, understanding of site layout, readiness of tender documents, and material standardization. Evidence from two building projects yielded performance-to-importance ratios of 1.06 and 0.67, supporting the use of the model to prioritize constructability gaps.

Authors

Publication Details

Journal
Revista de la construcción
Published
2026-11-27
DOI
https://doi.org/10.7764/rdlc.25.3.596
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A comprehensive constructability critical factors performance analysis for project delivery success

Jojok Widodo Soetjipto, Indra Nurtjahjaningtyas, Indra Budi Cahyanto
Revista de la construcción
Construction Project Management and Performance
article

A comprehensive constructability critical factors performance analysis for project delivery success

Jojok Widodo Soetjipto, Indra Nurtjahjaningtyas, Indra Budi Cahyanto
article en

Abstract

The current challenge of the construction industry is the very high increase in infrastructure needs. However, it is limited by resource availability, thus requiring increased productivity, competitiveness, and innovation. One of the efforts made is integrated planning across all project stages, known as constructability. Existing constructability studies have mostly focused on identifying constructability factors and assessing frameworks. Project implementation still faces obstacles because critical factors, such as construction knowledge and experience across planning, engineering, procurement, and field operations, have not been fully identified, even though these factors are essential to achieving overall project objectives. In addition, most constructability studies are limited to determining and validating variables without implementing them in real projects to measure the accuracy of the constructability model. Accordingly, this study develops a model using Importance–Performance Analysis (IPA) and the Relative Importance Index (RII). An initial set of 24 constructability variables was verified by 24 construction industry experts and subsequently refined into 22 variables across three project lifecycle phases. The importance and performance of these 22 variables were then assessed using 15 valid expert responses through IPA and RII. IPA identified five high-importance/low-performance variables as improvement priorities. RII highlighted the planning team's knowledge, understanding of site layout, readiness of tender documents, and material standardization. Evidence from two building projects yielded performance-to-importance ratios of 1.06 and 0.67, supporting the use of the model to prioritize constructability gaps.

Revista de la construcciónVol. 25(3)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon