Lattice design and commissioning of BEPCII energy upgrade

The Upgrade Project of the Beijing Electron-Positron Collider II (BEPCII) is a performance enhancement initiative carried out on the basis of the layout and beam parameters of the existing BEPCII facility. Adhering to the core principle of retaining the original tunnel layout unchanged, it achieves a remarkable boost in collision luminosity at the high-energy region through three key technical approaches: increasing beam intensity, raising the cavity voltage of radio frequency (RF) cavities to reduce bunch length, and compressing the betatron function at the interaction point (IP). To meet the core requirements of bunch length compression and beam power enhancement, the RF cavity system will be upgraded from the current single-ring single-cavity configuration to a single-ring dual-cavity structure. The hardware installation and commissioning work for the upgrade project were all successfully completed in May 2025, after which the facility officially entered the beam commissioning phase. This paper presents a comprehensive introduction to the implementation process and preliminary results of beam commissioning following the upgrade.

Authors

Publication Details

Journal
Modern Physics Letters A
Published
2026-11-27
DOI
https://doi.org/10.1142/s0217732326430091
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Lattice design and commissioning of BEPCII energy upgrade

Huiping Geng, Yanru Wei, Chenghui Yu, Yuan Zhang et al.
Modern Physics Letters A
Particle accelerators and beam dynamics
article

Lattice design and commissioning of BEPCII energy upgrade

Huiping Geng, Yanru Wei, Chenghui Yu, Yuan Zhang, Jun Xing
article en

Abstract

The Upgrade Project of the Beijing Electron-Positron Collider II (BEPCII) is a performance enhancement initiative carried out on the basis of the layout and beam parameters of the existing BEPCII facility. Adhering to the core principle of retaining the original tunnel layout unchanged, it achieves a remarkable boost in collision luminosity at the high-energy region through three key technical approaches: increasing beam intensity, raising the cavity voltage of radio frequency (RF) cavities to reduce bunch length, and compressing the betatron function at the interaction point (IP). To meet the core requirements of bunch length compression and beam power enhancement, the RF cavity system will be upgraded from the current single-ring single-cavity configuration to a single-ring dual-cavity structure. The hardware installation and commissioning work for the upgrade project were all successfully completed in May 2025, after which the facility officially entered the beam commissioning phase. This paper presents a comprehensive introduction to the implementation process and preliminary results of beam commissioning following the upgrade.

Modern Physics Letters A
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon