The Study on Supply Chain Management of Construction and Demolition Waste across Group Housing Development Projects in Bengaluru

Rapid urbanization across Bengaluru has driven a sharp rise in Construction and Demolition (C&D) waste generation. Despite regulatory frameworks such as the C&D Waste Management Rules, 2016, and the updated Environment (C&D) Waste Management Rules, 2025, most group housing projects continue to rely on a linear collect-transport-dispose model, showing limited traceability to authorized recycling plants. This research evaluates the Supply Chain Management (SCM) performance of C&D waste across four group housing developments in Bengaluru: Site 1 at Mallasandra (3,14,354sq.m), Site 2 at Kaggalipura (22,938sq.m), Site 3 at Devanahalli (66,195sq.m), and Site 4 at Devanahalli (1,19,000sq.m). Applying a load-based audit methodology (Volume=16m3×truckloads; Mass=Volume×density×composition), the recorded waste generation rates were 70kg/m2, 30.8kg/m2, 5.6kg/m2, and 51.5kg/m2, respectively. Waste during the finishing stage was primarily composed of bricks and blocks (50%-70%), cement, tiles, and packaging materials, whereas superstructure waste was dominated by soil and steel. SCM effectiveness varied widely among sites. Site 1 (Mallasandra), characterized by consistent source segregation and high compliance, achieved a 42.85% diversion rate (9,472tonnes recycled or reused). Conversely, Site 2 (Kaggalipura) recorded 0% diversion due to the absence of segregation and inadequate transport practices. Site 4 (Devanahalli) achieved only 13.47% diversion despite daily collection routines, constrained by unsegregated waste inputs. Meanwhile, Site 3 (Devanahalli) reached 75% diversion primarily through on-site soil reuse. The findings indicate that source segregation rather than collection frequency is the primary operational bottleneck, while recycling plant efficiency was rated as poor across all evaluated sites. To address these challenges, the study proposes a five-pillar circular SCM model aligned with Extended Producer Responsibility (EPR) targets (25% for 2025–26 scaling up to 100% by 2028–29) and mandated recycled content requirements (5% to 25% by 2030).

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-27
DOI
https://doi.org/10.5281/zenodo.24593087
Primary Topic
Recycled Aggregate Concrete Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

The Study on Supply Chain Management of Construction and Demolition Waste across Group Housing Development Projects in Bengaluru

Jyothi JS and Chandrashekar JS
Zenodo (CERN European Organization for Nuclear Research)
Recycled Aggregate Concrete Performance
article

The Study on Supply Chain Management of Construction and Demolition Waste across Group Housing Development Projects in Bengaluru

Jyothi JS and Chandrashekar JS
article en

Abstract

Rapid urbanization across Bengaluru has driven a sharp rise in Construction and Demolition (C&D) waste generation. Despite regulatory frameworks such as the C&D Waste Management Rules, 2016, and the updated Environment (C&D) Waste Management Rules, 2025, most group housing projects continue to rely on a linear collect-transport-dispose model, showing limited traceability to authorized recycling plants. This research evaluates the Supply Chain Management (SCM) performance of C&D waste across four group housing developments in Bengaluru: Site 1 at Mallasandra (3,14,354sq.m), Site 2 at Kaggalipura (22,938sq.m), Site 3 at Devanahalli (66,195sq.m), and Site 4 at Devanahalli (1,19,000sq.m). Applying a load-based audit methodology (Volume=16m3×truckloads; Mass=Volume×density×composition), the recorded waste generation rates were 70kg/m2, 30.8kg/m2, 5.6kg/m2, and 51.5kg/m2, respectively. Waste during the finishing stage was primarily composed of bricks and blocks (50%-70%), cement, tiles, and packaging materials, whereas superstructure waste was dominated by soil and steel. SCM effectiveness varied widely among sites. Site 1 (Mallasandra), characterized by consistent source segregation and high compliance, achieved a 42.85% diversion rate (9,472tonnes recycled or reused). Conversely, Site 2 (Kaggalipura) recorded 0% diversion due to the absence of segregation and inadequate transport practices. Site 4 (Devanahalli) achieved only 13.47% diversion despite daily collection routines, constrained by unsegregated waste inputs. Meanwhile, Site 3 (Devanahalli) reached 75% diversion primarily through on-site soil reuse. The findings indicate that source segregation rather than collection frequency is the primary operational bottleneck, while recycling plant efficiency was rated as poor across all evaluated sites. To address these challenges, the study proposes a five-pillar circular SCM model aligned with Extended Producer Responsibility (EPR) targets (25% for 2025–26 scaling up to 100% by 2028–29) and mandated recycled content requirements (5% to 25% by 2030).

Zenodo (CERN European Organization for Nuclear Research)
Recycled Aggregate Concrete Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon