Assessment of the Energy Performance and Supply Availability of a 1 MWp Photovoltaic Plant on the Surface of Mars
Speculative parametric study of the energy performance and supply availability of a 1 MWp photovoltaic plant with unmodified terrestrial modules on the surface of Mars. Mars receives less than half of Earth's sunlight (586 vs 1,361 W/m² at the top of the atmosphere), but at ground level the gap narrows: a horizontal panel at the Martian equator would receive about 1,310 kWh/m² per Earth year, roughly 83% of the 1,580 kWh/m² received in Singapore. A 1.001 MWp plant would deliver about 3.7 MWh AC per sol there. Energy, however, is not guaranteed power: what matters is how many kilowatts the plant can sustain through the night, the winter and the dust storms. The study integrates a 669-sol × 96-step simulation combining a Keplerian orbit, a radiative closure calibrated against the Appelbaum and Landis tables, tilted-plane geometry, cell temperature, soiling with periodic cleaning, and battery dispatch with a survival mode. Four synthetic dust years are tested, from a calm year to a global storm like that of 2018. Main results (model results, not measurements): with 5 MWh of batteries, the plant can supply at 95% temporal availability about 130 kW at the equator in a calm year (13% of nameplate power) and between 59 and 76 kW in global-storm years, i.e. 1.5 to 3.2 times the 40 kWe of a NASA reference fission system, between 30° S and 15° N. Nameplate power is the least informative metric; storm survival is a threshold problem governed by cleaning and auxiliary load rather than by battery size; and the modules alone weigh 2.7 to 5.9 times more per guaranteed kilowatt than the reference reactor. The paper also gives a parametric estimate of the base such power could sustain (10 to 20 people, with heating), plus eight falsifiable hypotheses and technical recommendations. The paper is speculative by design: results are conditional on explicit assumptions, and the modules and inverters used are model references, not equipment qualified for Mars. "Guaranteed" power is shorthand for 95% temporal availability and implies no operational guarantee. Code, data and reproducibility: https://github.com/josepluistajada/marte-pv-1mwp-v2 (Python model with a C dispatch kernel, MIT license).
Authors
- José Luis Tajada (ORCID: https://orcid.org/0000-0001-8255-0695)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-27
- DOI
- https://doi.org/10.5281/zenodo.24598127
- Primary Topic
- Planetary Science and Exploration
- Type
- preprint