Can Nuclear-Powered Cargo Ships Keep Their Schedules?
Can backup ports keep cargo arriving on time when a nuclear-powered container ship cannot use its primary port? This study models a hypothetical Atlantic service calling at Charleston, Savannah, and Norfolk. It uses the published port sequence, NOAA vessel-position data, and terminal restart schedules from the October 2024 U.S. port labor stoppage. It compares waiting at Savannah with diverting to Norfolk or, when the ship has not yet passed it, Charleston. The model measures when cargo reaches its final destination, not just when it is unloaded. Across 20,160 simulated policy runs, having two backup ports raised the mean share of cargo delivered on time from 66.2% to 88.5% when only the nuclear-powered ship was denied access to its primary port. When physical closures affected both vessel types, the improvement was smaller: 66.0% to 70.5%. Longer inland transfers and committing to a diversion too early sometimes made waiting the better choice. The companion archive contains the manuscript source, offline Python simulations, result tables, and filtered NOAA position data. This preprint has not been peer reviewed. The results describe the modeled scenarios and do not predict port permissions or real-world delivery performance.
Authors
- Daniel A. Pyle
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-27
- DOI
- https://doi.org/10.5281/zenodo.24576702
- Primary Topic
- Maritime Ports and Logistics
- Type
- preprint