Generative Structural Theory v2.22 — Minimum Moves and Deletions at Maximum Leaf-to-Leaf Arc Use on Five Arms for Every Budget of at Least Three

For five arms of any common integer length, ten moves suffice to use all fifteen eligible directed arcs between leaves and reach the bidirected tree from every prescribed start. Ten moves are necessary. Each of the five original rim arcs and each of the fifteen auxiliary arcs must be deleted before reaching the tree. Each move can delete at most two arcs. At arm length six, the construction in v2.20 takes eighteen moves from the designated start with the same pool. The five arms meet at a hub, and a directed cycle joins their leaves. A prescribed start contains this cycle, one intact bidirected arm, and both orientations of every tree edge except one missing pair on each of the other four arms. The auxiliary pool is fixed before the first move. Each move can add any available arcs, and every state must be inclusion-minimal strongly connected on the full vertex set. For every integer budget q ≥ 3, the maximum number of distinct leaf-to-leaf auxiliary arcs used on a successful chain is m = min{q, 15}. Among chains attaining this maximum, the minimum number of moves is ⌈(5 + m)/2⌉, the minimum total number of deletions is 5 + m, and the minimum total number of additions is 8 + m. A single chain attains all three values from each prescribed start. For each budget, the same pool of m arcs works for every start. The pools coincide with the nested pools of v2.20. No deleted arc reappears in the exhibited chains. The proof lifts 65 explicit chains at arm length one to arbitrary arm lengths and prescribed gap depths. The distribution includes English and Japanese proofs, the complete table of 65 chains, 195 labelled certificates covering 1,410 moves, and Python code for replay. A separate sweep over all 4,895 prescribed starts at lengths one through five checks 68,530 chains comprising 509,080 moves.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-26
DOI
https://doi.org/10.5281/zenodo.24561623
Primary Topic
Advanced Graph Theory Research
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Generative Structural Theory v2.22 — Minimum Moves and Deletions at Maximum Leaf-to-Leaf Arc Use on Five Arms for Every Budget of at Least Three

Koji Okino
Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
preprint

Generative Structural Theory v2.22 — Minimum Moves and Deletions at Maximum Leaf-to-Leaf Arc Use on Five Arms for Every Budget of at Least Three

Koji Okino
preprint en

Abstract

For five arms of any common integer length, ten moves suffice to use all fifteen eligible directed arcs between leaves and reach the bidirected tree from every prescribed start. Ten moves are necessary. Each of the five original rim arcs and each of the fifteen auxiliary arcs must be deleted before reaching the tree. Each move can delete at most two arcs. At arm length six, the construction in v2.20 takes eighteen moves from the designated start with the same pool. The five arms meet at a hub, and a directed cycle joins their leaves. A prescribed start contains this cycle, one intact bidirected arm, and both orientations of every tree edge except one missing pair on each of the other four arms. The auxiliary pool is fixed before the first move. Each move can add any available arcs, and every state must be inclusion-minimal strongly connected on the full vertex set. For every integer budget q ≥ 3, the maximum number of distinct leaf-to-leaf auxiliary arcs used on a successful chain is m = min{q, 15}. Among chains attaining this maximum, the minimum number of moves is ⌈(5 + m)/2⌉, the minimum total number of deletions is 5 + m, and the minimum total number of additions is 8 + m. A single chain attains all three values from each prescribed start. For each budget, the same pool of m arcs works for every start. The pools coincide with the nested pools of v2.20. No deleted arc reappears in the exhibited chains. The proof lifts 65 explicit chains at arm length one to arbitrary arm lengths and prescribed gap depths. The distribution includes English and Japanese proofs, the complete table of 65 chains, 195 labelled certificates covering 1,410 moves, and Python code for replay. A separate sweep over all 4,895 prescribed starts at lengths one through five checks 68,530 chains comprising 509,080 moves.

Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon