A Critical Assessment of Rework Causation Factors in Construction Projects

Rework continues to pose a significant challenge to construction project performance, leading to cost overruns, schedule delays, and compromised quality. While prior research has identified rework causes in fragmented or discipline-specific contexts, this study presents a holistic and quantifiable framework that integrates expert consensus with a multidimensional fuzzy inference system (FIS). Using inputs from 200 construction professionals, the study employs Kendall’s coefficient of concordance to validate expert agreement on 43 critical rework causation factors and then applies a Mamdani-type FIS weighted by relative importance index values to model rework risk across four key domains: design; construction management; labor; and client/consultant interaction. The scientific contribution of this research lies in its ability to translate subjective expert judgment into interpretable, scalable, and data-light risk outputs, something not achievable through traditional regression- or AI-based models alone. This approach enables proactive identification and ranking of rework causation factors even in early-stage or data-scarce environments. By producing a calibrated, adaptable decision-support model, the study empowers practitioners to prioritize interventions, integrate predictive analytics with tools like building information modeling, and improve construction planning and resource allocation. The findings offer methodological advancement and practical utility in supporting sustainable, rework-resilient project delivery.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2026-11-26
DOI
https://doi.org/10.1061/jcemd4.coeng-19102
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A Critical Assessment of Rework Causation Factors in Construction Projects

Murat Gündüz, Mina S. Daneshvar, Khalid K. Naji
Journal of Construction Engineering and Management
Construction Project Management and Performance
article

A Critical Assessment of Rework Causation Factors in Construction Projects

Murat Gündüz, Mina S. Daneshvar, Khalid K. Naji
article en

Abstract

Rework continues to pose a significant challenge to construction project performance, leading to cost overruns, schedule delays, and compromised quality. While prior research has identified rework causes in fragmented or discipline-specific contexts, this study presents a holistic and quantifiable framework that integrates expert consensus with a multidimensional fuzzy inference system (FIS). Using inputs from 200 construction professionals, the study employs Kendall’s coefficient of concordance to validate expert agreement on 43 critical rework causation factors and then applies a Mamdani-type FIS weighted by relative importance index values to model rework risk across four key domains: design; construction management; labor; and client/consultant interaction. The scientific contribution of this research lies in its ability to translate subjective expert judgment into interpretable, scalable, and data-light risk outputs, something not achievable through traditional regression- or AI-based models alone. This approach enables proactive identification and ranking of rework causation factors even in early-stage or data-scarce environments. By producing a calibrated, adaptable decision-support model, the study empowers practitioners to prioritize interventions, integrate predictive analytics with tools like building information modeling, and improve construction planning and resource allocation. The findings offer methodological advancement and practical utility in supporting sustainable, rework-resilient project delivery.

Journal of Construction Engineering and ManagementVol. 153(2)
Qatar University (QA)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
A Critical Assessment of Rework Causation Factors in Construction Projects — Murat Gündüz, Mina S. Daneshvar, et al. · Journal of Construction Engineering and Management (2026) | TGRS Research Map | TGRS