Generative Structural Theory v2.27 — Shortest Chains for Every Fixed v2.20 Prefix on Nine Arms and for Prefixes up to Six Arcs Short of Saturation

On nine arms of length six, the first 57 auxiliary leaf-to-leaf arcs in the order of v2.20 can all be used on a chain of 33 moves to the bidirected tree. The initial nine rim arcs and all 57 auxiliary arcs must be deleted. Each of the 33 moves deletes exactly two arcs, attaining the lower bound of 66 deletions. The v2.20 construction takes 64 moves on the same 55 vertices with the same start and pool. The arms meet at a hub. A prescribed start contains the directed rim cycle, one intact bidirected arm, and a gap consisting of both orientations of one edge on each other arm. Every state is inclusion-minimal strongly connected on the full vertex set. A move deletes at most two arcs and may simultaneously add any allowed arcs. The pool is fixed to the first m eligible arcs in the v2.20 order, and every selected arc must occur in a state. For nine arms and every integer budget q ≥ 7, put m = min(q, 63). Across all 57 effective prefix sizes, the minimum numbers of moves, deletions and additions are ⌈(9 + m)/2⌉, 9 + m and 16 + m, respectively. For each size, one schedule of leaf edits attains all three minima from every prescribed start and at every common integer arm length L ≥ 1. For every k ≥ 9 and every deficit d from 1 through 6, fix the first k(k − 2) − d eligible arcs. The minimum numbers of moves, deletions and additions are ⌈(k(k − 1) − d)/2⌉, k(k − 1) − d and k(k − 1) + k − 2 − d. The one-arc deficit was established in v2.26. The six nine-arm schedules for m = 57 through 62 all retire the rim arc 0 → 1 and its reverse in the same move. Subdividing that rim position and inserting unused opposite pairs gives the construction for every larger arm count. The preprint includes the 33-move example and all 57 nine-arm leaf schedules. The archive contains English and Japanese proofs, construction and verification code, and 1,539 labelled certificates. A separate replay covers 134,154 chains and 3,016,152 moves at arm lengths one and two. A further 588 chains test all six deficits at arm counts ten through sixteen.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-27
DOI
https://doi.org/10.5281/zenodo.24561747
Primary Topic
Advanced Graph Theory Research
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Generative Structural Theory v2.27 — Shortest Chains for Every Fixed v2.20 Prefix on Nine Arms and for Prefixes up to Six Arcs Short of Saturation

Koji Okino
Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
preprint

Generative Structural Theory v2.27 — Shortest Chains for Every Fixed v2.20 Prefix on Nine Arms and for Prefixes up to Six Arcs Short of Saturation

Koji Okino
preprint en

Abstract

On nine arms of length six, the first 57 auxiliary leaf-to-leaf arcs in the order of v2.20 can all be used on a chain of 33 moves to the bidirected tree. The initial nine rim arcs and all 57 auxiliary arcs must be deleted. Each of the 33 moves deletes exactly two arcs, attaining the lower bound of 66 deletions. The v2.20 construction takes 64 moves on the same 55 vertices with the same start and pool. The arms meet at a hub. A prescribed start contains the directed rim cycle, one intact bidirected arm, and a gap consisting of both orientations of one edge on each other arm. Every state is inclusion-minimal strongly connected on the full vertex set. A move deletes at most two arcs and may simultaneously add any allowed arcs. The pool is fixed to the first m eligible arcs in the v2.20 order, and every selected arc must occur in a state. For nine arms and every integer budget q ≥ 7, put m = min(q, 63). Across all 57 effective prefix sizes, the minimum numbers of moves, deletions and additions are ⌈(9 + m)/2⌉, 9 + m and 16 + m, respectively. For each size, one schedule of leaf edits attains all three minima from every prescribed start and at every common integer arm length L ≥ 1. For every k ≥ 9 and every deficit d from 1 through 6, fix the first k(k − 2) − d eligible arcs. The minimum numbers of moves, deletions and additions are ⌈(k(k − 1) − d)/2⌉, k(k − 1) − d and k(k − 1) + k − 2 − d. The one-arc deficit was established in v2.26. The six nine-arm schedules for m = 57 through 62 all retire the rim arc 0 → 1 and its reverse in the same move. Subdividing that rim position and inserting unused opposite pairs gives the construction for every larger arm count. The preprint includes the 33-move example and all 57 nine-arm leaf schedules. The archive contains English and Japanese proofs, construction and verification code, and 1,539 labelled certificates. A separate replay covers 134,154 chains and 3,016,152 moves at arm lengths one and two. A further 588 chains test all six deficits at arm counts ten through sixteen.

Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon