Generative Structural Theory v2.23 — Shortest Chains and Start-Independent Leaf-Arc Schedules for Maximum Leaf-to-Leaf Arc Use on Six Arms

Fifteen moves suffice to use all 24 eligible directed auxiliary arcs between the leaves of a six-arm tree and reach the bidirected tree from every prescribed start. Each of the six original rim arcs and each of the 24 auxiliary arcs must be deleted before the target is reached. A move deletes at most two arcs, so fifteen moves are necessary. At arm length six, the v2.20 construction takes 28 moves from the same designated start with the same pool. Six arms of common integer length L ≥ 1 meet at a hub. A directed cycle joins their leaves. Initially one arm is intact, and each other arm lacks both orientations of one tree edge at an arbitrary depth. A pool of at most q auxiliary arcs is fixed before the first move. Each move may add any allowed arcs, and every state must be inclusion-minimal strongly connected on the full vertex set. For every integer budget q ≥ 4, the largest number of distinct leaf-to-leaf auxiliary arcs used on a successful chain is m = min(q, 24). Among chains using this maximum, the minimum number of moves is ⌈(6 + m)/2⌉, the minimum total number of deletions is 6 + m, and the minimum total number of additions is 10 + m. One chain attains all three minima from each prescribed start. For each m, one fixed pool and one sequence of leaf-arc edits serve every initially intact arm, gap profile and arm length. Each weak component of the leaf graph has one intact arm linking it to the hub. When a component splits, each part that contains no previous root repairs one arm. The 21 leaf-arc schedules thus determine chains for all 126 combinations of effective budget and initially intact arm. The distribution includes English and Japanese proofs, the complete schedules, 378 labelled certificates covering 3,870 moves, and Python code for replay. An exhaustive replay at lengths 1 through 4 covers all 7,800 prescribed starts at budgets 4 through 25, giving 171,600 chains and 1,794,000 moves.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-26
DOI
https://doi.org/10.5281/zenodo.24561654
Primary Topic
Advanced Graph Theory Research
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Generative Structural Theory v2.23 — Shortest Chains and Start-Independent Leaf-Arc Schedules for Maximum Leaf-to-Leaf Arc Use on Six Arms

Koji Okino
Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
preprint

Generative Structural Theory v2.23 — Shortest Chains and Start-Independent Leaf-Arc Schedules for Maximum Leaf-to-Leaf Arc Use on Six Arms

Koji Okino
preprint en

Abstract

Fifteen moves suffice to use all 24 eligible directed auxiliary arcs between the leaves of a six-arm tree and reach the bidirected tree from every prescribed start. Each of the six original rim arcs and each of the 24 auxiliary arcs must be deleted before the target is reached. A move deletes at most two arcs, so fifteen moves are necessary. At arm length six, the v2.20 construction takes 28 moves from the same designated start with the same pool. Six arms of common integer length L ≥ 1 meet at a hub. A directed cycle joins their leaves. Initially one arm is intact, and each other arm lacks both orientations of one tree edge at an arbitrary depth. A pool of at most q auxiliary arcs is fixed before the first move. Each move may add any allowed arcs, and every state must be inclusion-minimal strongly connected on the full vertex set. For every integer budget q ≥ 4, the largest number of distinct leaf-to-leaf auxiliary arcs used on a successful chain is m = min(q, 24). Among chains using this maximum, the minimum number of moves is ⌈(6 + m)/2⌉, the minimum total number of deletions is 6 + m, and the minimum total number of additions is 10 + m. One chain attains all three minima from each prescribed start. For each m, one fixed pool and one sequence of leaf-arc edits serve every initially intact arm, gap profile and arm length. Each weak component of the leaf graph has one intact arm linking it to the hub. When a component splits, each part that contains no previous root repairs one arm. The 21 leaf-arc schedules thus determine chains for all 126 combinations of effective budget and initially intact arm. The distribution includes English and Japanese proofs, the complete schedules, 378 labelled certificates covering 3,870 moves, and Python code for replay. An exhaustive replay at lengths 1 through 4 covers all 7,800 prescribed starts at budgets 4 through 25, giving 171,600 chains and 1,794,000 moves.

Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Generative Structural Theory v2.23 — Shortest Chains and Start-Independent Leaf-Arc Schedules for Maximum Leaf-to-Leaf Arc Use on Six Arms — Koji Okino · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS