How much, and where: a dated cost forecast for the Newcastle–Sydney high-speed rail line
Australia's first high-speed railway, from Newcastle through the Central Coast to Sydney and on to Western Sydney International Airport, carries a published P90 cost of AUD 93.6 billion. This paper puts two questions to that number and writes the answers down before any construction starts. The first is how much the line is likely to cost. I answer it with a reference class: the recorded cost growth of 97 transport megaprojects, and of the 31 high-speed and main-line railways among them. Grown from the AUD 80 billion middle of the authority's own range, that history puts the line at about AUD 111 billion in the middle case and AUD 159 billion at P80. Only five of the 31 railways stayed inside the 17% headroom that separates AUD 80 billion from the published P90. The second question is where the risk will travel. I answer it with a cost-risk network of 12 risks and 18 links, every value taken by written rule from the same 31 railways rather than set by judgement. Tunnelling is the crossroads. Protecting its four links removes 41% of the cost that comes from risks setting each other off, against 11% for the best single link and 10% for a firewall around the delay bill, and it stays the crossroads in all 12 robustness tests. The paper ends with three claims that can be checked against the public record as the project moves. Deposited with this record: the working paper (PDF), the rule-built register and result tables. The views expressed are the author's own and not those of any employer or client.
Authors
- Nikhil Dhand (ORCID: https://orcid.org/0009-0000-6526-8399)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-26
- DOI
- https://doi.org/10.5281/zenodo.24551260
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00