Generative Structural Theory v2.24 — Shortest Chains at Maximum Leaf-to-Leaf Arc Use on Seven Arms and a Tree-Exchange Construction for Arbitrary Arm Counts

Twenty-one moves suffice to use all 35 eligible leaf-to-leaf auxiliary arcs on seven arms and reach the bidirected tree from every prescribed start. All seven original rim arcs and all 35 auxiliary arcs must be deleted. Each move deletes at most two arcs, so 21 moves are necessary. At arm length six (43 vertices), the v2.20 construction takes 40 moves from the same start with the same pool. The arms have a common integer length L ≥ 1 and meet at a hub. A directed cycle joins their leaves. Initially one arm is intact, and each other arm lacks both directions of one tree edge at an arbitrary depth. A pool of at most q auxiliary arcs is fixed before the first move. Each move may add any allowed arcs. Every state is inclusion-minimal strongly connected on the full vertex set. For seven arms and every integer budget q ≥ 5, the maximum number of distinct leaf-to-leaf auxiliary arcs used on a successful chain is m = min(q, 35). Among chains using this maximum, the minimum number of moves is ⌈(7 + m)/2⌉, the minimum total number of deletions is 7 + m, and the minimum total number of additions is 12 + m. One chain attains all three minima. For each m, the same prefix of the v2.20 pool order and the same sequence of leaf-arc edits serve every initial intact arm, gap profile and arm length. The 31 schedules cover all 217 pairs of effective budget and initially intact arm. For any arm count k ≥ 3 and integer budget q ≥ k − 2, put m = min(q, k(k − 2)). Whenever k + m is odd, a tree-exchange construction attains all three minima, with ⌈(k + m)/2⌉ moves, k + m deletions and 2(k − 1) + m additions. Its fixed pool consists of the reverses of k − 1 rim arcs and both directions of (m − k + 1)/2 chords. The first move turns the rim into a bidirected path. Each chord then replaces one edge of the current tree. Removing the final tree edges repairs one arm per move. The distribution includes English and Japanese proofs, the leaf schedules and arm-repair tables, 651 labelled certificates covering 8,946 moves, and Python code. A seven-arm replay at lengths 1 through 3 covers all 5,558 prescribed starts and budgets 5 through 36, giving 177,856 chains and 2,484,426 moves. A separate replay of the odd-sum construction for 3 through 12 arms covers 2,365 chains and 69,069 moves.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-27
DOI
https://doi.org/10.5281/zenodo.24561680
Primary Topic
Advanced Graph Theory Research
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Generative Structural Theory v2.24 — Shortest Chains at Maximum Leaf-to-Leaf Arc Use on Seven Arms and a Tree-Exchange Construction for Arbitrary Arm Counts

Koji Okino
Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
preprint

Generative Structural Theory v2.24 — Shortest Chains at Maximum Leaf-to-Leaf Arc Use on Seven Arms and a Tree-Exchange Construction for Arbitrary Arm Counts

Koji Okino
preprint en

Abstract

Twenty-one moves suffice to use all 35 eligible leaf-to-leaf auxiliary arcs on seven arms and reach the bidirected tree from every prescribed start. All seven original rim arcs and all 35 auxiliary arcs must be deleted. Each move deletes at most two arcs, so 21 moves are necessary. At arm length six (43 vertices), the v2.20 construction takes 40 moves from the same start with the same pool. The arms have a common integer length L ≥ 1 and meet at a hub. A directed cycle joins their leaves. Initially one arm is intact, and each other arm lacks both directions of one tree edge at an arbitrary depth. A pool of at most q auxiliary arcs is fixed before the first move. Each move may add any allowed arcs. Every state is inclusion-minimal strongly connected on the full vertex set. For seven arms and every integer budget q ≥ 5, the maximum number of distinct leaf-to-leaf auxiliary arcs used on a successful chain is m = min(q, 35). Among chains using this maximum, the minimum number of moves is ⌈(7 + m)/2⌉, the minimum total number of deletions is 7 + m, and the minimum total number of additions is 12 + m. One chain attains all three minima. For each m, the same prefix of the v2.20 pool order and the same sequence of leaf-arc edits serve every initial intact arm, gap profile and arm length. The 31 schedules cover all 217 pairs of effective budget and initially intact arm. For any arm count k ≥ 3 and integer budget q ≥ k − 2, put m = min(q, k(k − 2)). Whenever k + m is odd, a tree-exchange construction attains all three minima, with ⌈(k + m)/2⌉ moves, k + m deletions and 2(k − 1) + m additions. Its fixed pool consists of the reverses of k − 1 rim arcs and both directions of (m − k + 1)/2 chords. The first move turns the rim into a bidirected path. Each chord then replaces one edge of the current tree. Removing the final tree edges repairs one arm per move. The distribution includes English and Japanese proofs, the leaf schedules and arm-repair tables, 651 labelled certificates covering 8,946 moves, and Python code. A seven-arm replay at lengths 1 through 3 covers all 5,558 prescribed starts and budgets 5 through 36, giving 177,856 chains and 2,484,426 moves. A separate replay of the odd-sum construction for 3 through 12 arms covers 2,365 chains and 69,069 moves.

Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon