Conceptual Design of a Breakwater-Protected Offshore Floating Photovoltaic System: Layout Selection, Mooring and Anchoring Across Three European Sea Basins

Offshore floating photovoltaic (FPV) arrays can be sheltered by a surrounding floating breakwater, whose layout, anchoring and connection to the PV array then govern the design. This conceptual design study considers a 10 MWp FPV plant enclosed by modular concrete breakwater pontoons at three sites with mild (Baltic Sea, 16 m water depth), moderate (Mediterranean Sea, 38 m) and harsh (North Sea, 49 m) conditions. Initial mooring dimensions were derived from single-pontoon CFD results. Subsequent time-domain simulations of the complete moored breakwater ring provided mooring-line loads that informed a revision of the chain diameters, lengths and anchor positions. Five layouts of equivalent PV area (circular, octagonal, triangular, elliptical and square) are rated against eight technical and economic criteria. The circular layout (diameter 346 m, 56 breakwater pontoons) ranks first, with the best rating in six of the eight criteria. For this layout, a multi-point catenary mooring with grade R4 stud link chains and driven steel piles is sized per site, including corrosion (40-year life) and marine growth allowances. The revised configurations use chain diameters of 107 mm for the Baltic Sea site and 87 mm for both the Mediterranean Sea and North Sea sites, with total chain lengths of 132.80 m, 192.60 m and 198.70 m, respectively. A floating tubular transition element connected by pre-tensioned polypropylene ropes is proposed between breakwater and PV array. A structural model of a 20 × 14 module array gives rope safety factors of 3.2 and 4.4 against the supplier breaking loads. The revised anchoring configurations incorporate the findings of the system-level simulations, while detailed mooring-line dynamics, applicable limit-state checks and site-specific foundation design remain necessary.

Authors

Publication Details

Journal
Preprints.org
Published
2026-11-25
DOI
https://doi.org/10.20944/preprints202611.2662.v1
Primary Topic
Offshore Engineering and Technologies
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Conceptual Design of a Breakwater-Protected Offshore Floating Photovoltaic System: Layout Selection, Mooring and Anchoring Across Three European Sea Basins

Balram Panjwani, Thomas Pehlke
Preprints.org
Offshore Engineering and Technologies
preprint

Conceptual Design of a Breakwater-Protected Offshore Floating Photovoltaic System: Layout Selection, Mooring and Anchoring Across Three European Sea Basins

Balram Panjwani, Thomas Pehlke
preprint en

Abstract

Offshore floating photovoltaic (FPV) arrays can be sheltered by a surrounding floating breakwater, whose layout, anchoring and connection to the PV array then govern the design. This conceptual design study considers a 10 MWp FPV plant enclosed by modular concrete breakwater pontoons at three sites with mild (Baltic Sea, 16 m water depth), moderate (Mediterranean Sea, 38 m) and harsh (North Sea, 49 m) conditions. Initial mooring dimensions were derived from single-pontoon CFD results. Subsequent time-domain simulations of the complete moored breakwater ring provided mooring-line loads that informed a revision of the chain diameters, lengths and anchor positions. Five layouts of equivalent PV area (circular, octagonal, triangular, elliptical and square) are rated against eight technical and economic criteria. The circular layout (diameter 346 m, 56 breakwater pontoons) ranks first, with the best rating in six of the eight criteria. For this layout, a multi-point catenary mooring with grade R4 stud link chains and driven steel piles is sized per site, including corrosion (40-year life) and marine growth allowances. The revised configurations use chain diameters of 107 mm for the Baltic Sea site and 87 mm for both the Mediterranean Sea and North Sea sites, with total chain lengths of 132.80 m, 192.60 m and 198.70 m, respectively. A floating tubular transition element connected by pre-tensioned polypropylene ropes is proposed between breakwater and PV array. A structural model of a 20 × 14 module array gives rope safety factors of 3.2 and 4.4 against the supplier breaking loads. The revised anchoring configurations incorporate the findings of the system-level simulations, while detailed mooring-line dynamics, applicable limit-state checks and site-specific foundation design remain necessary.

Preprints.org
Offshore Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon