Noncyclic scheduling of dual-armed cluster tools considering multiple wafer types and chamber cleaning operations
Cluster tools often constitute the bottleneck in wafer fabrication systems. Existing research focuses on cyclic scheduling with prefixed robot operation sequences, which is well suited to large-lot production of identical wafers. However, the rising demand for diverse chips necessitates efficient scheduling for small-lot production involving multiple wafer types. Furthermore, the requirement for high-precision circuit linewidths makes integrated chamber cleaning a critical constraint in cluster tool scheduling. Motivated by these trends, we investigate a noncyclic scheduling problem that jointly considers multiple wafer types, dual-armed robot operations, and chamber cleaning requirements. We formulate a Mixed Integer Linear Programming (MILP) model to schedule robot transportation operations and chamber cleaning operations with the objective of minimising makespan. To ensure practical scalability, we propose a Learning-based Tree Search (LTS) algorithm. This approach enhances deep Q-network inference through an online search mechanism that integrates tree-structured exploration, agent-guided rollout, and valid lower-bound estimation. Computational results demonstrate that the MILP model can optimally solve instances with up to 25 wafers, while the LTS algorithm enables real-time decision-making for larger instances, requiring approximately one second per scheduling action.
Authors
- Jianguang Feng (ORCID: https://orcid.org/0000-0003-4927-9025)
- 董自雄
- Ada Che (ORCID: https://orcid.org/0000-0002-8133-4058)
Institutions
- Northwestern Polytechnical University (CN)
Publication Details
- Journal
- International Journal of Production Research
- Published
- 2026-11-26
- DOI
- https://doi.org/10.1080/00207543.2026.2767070
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 0.00