Power from Hydrokinetic Energy in Open Channels: What Next?

Hydrokinetic energy (HKE) has a large resource and the basic technology required to exploit it already exists. Yet, despite decades of research and numerous successful demonstrations, widespread deployment has not followed. This position paper argues that further incremental improvements in turbine efficiency are unlikely to alter the prospects for widespread deployment. The principal challenge is economic: HKE must find applications in which its system value justifies its comparatively high cost. In the short term, managed waterways such as irrigation and water-supply canals offer the most credible route, but viable projects will require mass-produced turbines, array-scale deployment, better use of available hydraulic head, and substantial reductions in power take-off, installation and maintenance costs. In the medium term, HKE should increasingly share electrical, structural and operational infrastructure with other renewable-energy technologies. Large arrays in natural rivers remain a longer-term prospect. Without substantial cost reduction, deployment at scale and sustained support from governments or patient strategic capital, HKE risks remaining a technically successful but commercially marginal renewable-energy technology.

Authors

Institutions

Publication Details

Journal
Flow Turbulence and Combustion
Published
2026-11-26
DOI
https://doi.org/10.1007/s10494-026-00807-2
Primary Topic
Wind Energy Research and Development
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Power from Hydrokinetic Energy in Open Channels: What Next?

Thorsten Stoesser
Flow Turbulence and Combustion
Wind Energy Research and Development
article

Power from Hydrokinetic Energy in Open Channels: What Next?

Thorsten Stoesser
article en

Abstract

Hydrokinetic energy (HKE) has a large resource and the basic technology required to exploit it already exists. Yet, despite decades of research and numerous successful demonstrations, widespread deployment has not followed. This position paper argues that further incremental improvements in turbine efficiency are unlikely to alter the prospects for widespread deployment. The principal challenge is economic: HKE must find applications in which its system value justifies its comparatively high cost. In the short term, managed waterways such as irrigation and water-supply canals offer the most credible route, but viable projects will require mass-produced turbines, array-scale deployment, better use of available hydraulic head, and substantial reductions in power take-off, installation and maintenance costs. In the medium term, HKE should increasingly share electrical, structural and operational infrastructure with other renewable-energy technologies. Large arrays in natural rivers remain a longer-term prospect. Without substantial cost reduction, deployment at scale and sustained support from governments or patient strategic capital, HKE risks remaining a technically successful but commercially marginal renewable-energy technology.

Flow Turbulence and CombustionVol. 117(4)
University College London (GB)
Wind Energy Research and Development
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Power from Hydrokinetic Energy in Open Channels: What Next? — Thorsten Stoesser · Flow Turbulence and Combustion (2026) | TGRS Research Map | TGRS