Robust Mean-Variance Optimization for Load Aggregators: An Analytical Approach to Multi-Market Electricity Procurement

The multi-market electricity procurement problem exposes load aggregators to significant financial risk due to the inherent volatility and unpredictability of electricity prices across day-ahead, real-time, and long-term contract markets. This paper proposes a min-max robust mean-risk framework that optimizes procurement decisions against worst-case price uncertainty, yielding a conservative upper-bounding strictly convex quadratic program that balances expected cost against risk exposure through a risk-aversion parameter. To overcome the computational challenge posed by time-coupled cumulative procurement caps over extended horizons, Lagrangian relaxation is employed to decompose the primal problem into independent per-period subproblems. Each per-period subproblem is solved analytically: its constraint set is transformed into a two-dimensional convex polygon, and both its interior and boundary are examined systematically to determine the optimum of that subproblem, achieving constant-time solutions for each subproblem and entirely eliminating the reliance on commercial solvers. The analytical solver is embedded within a single-stage Polyak subgradient strategy followed by a final feasibility restoration that returns a constraint-satisfying schedule. Numerical case studies across horizons from 24 to 8760 h demonstrate that the proposed method matches Gurobi for the same quadratic program formulation within numerical tolerance while maintaining nearly constant per-period computation time and indicating favorable scaling potential. Sensitivity analyses reveal that cumulative purchase caps and the risk-aversion parameter are the primary drivers of procurement structure, with the long-term contract market dominating due to its low price volatility. The proposed method provides an efficient, scalable, and solver-free alternative for long-horizon procurement scheduling, particularly valuable when computational resources are constrained.

Authors

Institutions

Publication Details

Journal
Energies
Published
2026-11-26
DOI
https://doi.org/10.3390/en19235734
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Robust Mean-Variance Optimization for Load Aggregators: An Analytical Approach to Multi-Market Electricity Procurement

Tao Ding, Daen Bao, Linlin Wang, Zhuo Wang et al.
Energies
Electric Power System Optimization
article

Robust Mean-Variance Optimization for Load Aggregators: An Analytical Approach to Multi-Market Electricity Procurement

Tao Ding, Daen Bao, Linlin Wang, Zhuo Wang, Tong Yu, Rubiao Li, Zhuopu Han
article en

Abstract

The multi-market electricity procurement problem exposes load aggregators to significant financial risk due to the inherent volatility and unpredictability of electricity prices across day-ahead, real-time, and long-term contract markets. This paper proposes a min-max robust mean-risk framework that optimizes procurement decisions against worst-case price uncertainty, yielding a conservative upper-bounding strictly convex quadratic program that balances expected cost against risk exposure through a risk-aversion parameter. To overcome the computational challenge posed by time-coupled cumulative procurement caps over extended horizons, Lagrangian relaxation is employed to decompose the primal problem into independent per-period subproblems. Each per-period subproblem is solved analytically: its constraint set is transformed into a two-dimensional convex polygon, and both its interior and boundary are examined systematically to determine the optimum of that subproblem, achieving constant-time solutions for each subproblem and entirely eliminating the reliance on commercial solvers. The analytical solver is embedded within a single-stage Polyak subgradient strategy followed by a final feasibility restoration that returns a constraint-satisfying schedule. Numerical case studies across horizons from 24 to 8760 h demonstrate that the proposed method matches Gurobi for the same quadratic program formulation within numerical tolerance while maintaining nearly constant per-period computation time and indicating favorable scaling potential. Sensitivity analyses reveal that cumulative purchase caps and the risk-aversion parameter are the primary drivers of procurement structure, with the long-term contract market dominating due to its low price volatility. The proposed method provides an efficient, scalable, and solver-free alternative for long-horizon procurement scheduling, particularly valuable when computational resources are constrained.

EnergiesVol. 19(23)
CHN Energy (China) (CN), Xi'an Jiaotong University (CN)
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon