РИЗИК-ОРІЄНТОВАНА МЕТОДОЛОГІЯ УПРАВЛІННЯ ПРОЄКТНОЮ ДІЯЛЬНІСТЮ ОРГАНІЗАЦІЙ В УМОВАХ ПОВОЄННОГО ВІДНОВЛЕННЯ

The article substantiates a risk-oriented methodology for managing the project activities of organizations in the context of Ukraine’s post-war recovery. The relevance of the study stems from the scale of reconstruction needs, the high uncertainty of the project environment and the cascading propagation of risks across management levels. The purpose of the article is to develop a methodological approach to the identification, hierarchization, assessment and monitoring of recovery project risks that is aligned with the multilevel system of public strategic planning. The research is based on the systems and process approaches, a comparative analysis of scientific literature and international standards (ISO 31000:2018, COSO ERM, PMBOK® Guide), structural and functional modelling, logical generalization and an analysis of recovery programme documents. A five-level risk hierarchy is proposed (macro-system, sectoral and segment levels, the level of risk concentration nodes, and the project-organizational level), which extends an existing classification of entrepreneurial risks of real estate investment projects; the mechanism of cascading risk propagation between levels is described. A six-stage methodology is substantiated that combines expert assessment under incomplete information, correction of behavioural biases in forecasting, scenario analysis, and monitoring of project execution using earned value and risk-based earned duration management. The mechanism for applying the methodology at the national, subnational and local levels is defined through the synchronization of project life-cycle phases with recovery programme documents and the DREAM digital ecosystem. The results can be used by development and construction companies, financial institutions, public authorities and local governments when building risk management systems and reconstruction project portfolios. Empirical testing of the methodology is identified as a direction for further research.

Authors

Institutions

Publication Details

Journal
Development Service Industry Management
Published
2026-11-26
DOI
https://doi.org/10.31891/dsim-2026-16(41)
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

РИЗИК-ОРІЄНТОВАНА МЕТОДОЛОГІЯ УПРАВЛІННЯ ПРОЄКТНОЮ ДІЯЛЬНІСТЮ ОРГАНІЗАЦІЙ В УМОВАХ ПОВОЄННОГО ВІДНОВЛЕННЯ

Ірина ДВОРНИК, Михайло КРИВДИК, Olga Ivanivna Garafonova
Development Service Industry Management
Construction Project Management and Performance
article

РИЗИК-ОРІЄНТОВАНА МЕТОДОЛОГІЯ УПРАВЛІННЯ ПРОЄКТНОЮ ДІЯЛЬНІСТЮ ОРГАНІЗАЦІЙ В УМОВАХ ПОВОЄННОГО ВІДНОВЛЕННЯ

Ірина ДВОРНИК, Михайло КРИВДИК, Olga Ivanivna Garafonova
article en

Abstract

The article substantiates a risk-oriented methodology for managing the project activities of organizations in the context of Ukraine’s post-war recovery. The relevance of the study stems from the scale of reconstruction needs, the high uncertainty of the project environment and the cascading propagation of risks across management levels. The purpose of the article is to develop a methodological approach to the identification, hierarchization, assessment and monitoring of recovery project risks that is aligned with the multilevel system of public strategic planning. The research is based on the systems and process approaches, a comparative analysis of scientific literature and international standards (ISO 31000:2018, COSO ERM, PMBOK® Guide), structural and functional modelling, logical generalization and an analysis of recovery programme documents. A five-level risk hierarchy is proposed (macro-system, sectoral and segment levels, the level of risk concentration nodes, and the project-organizational level), which extends an existing classification of entrepreneurial risks of real estate investment projects; the mechanism of cascading risk propagation between levels is described. A six-stage methodology is substantiated that combines expert assessment under incomplete information, correction of behavioural biases in forecasting, scenario analysis, and monitoring of project execution using earned value and risk-based earned duration management. The mechanism for applying the methodology at the national, subnational and local levels is defined through the synchronization of project life-cycle phases with recovery programme documents and the DREAM digital ecosystem. The results can be used by development and construction companies, financial institutions, public authorities and local governments when building risk management systems and reconstruction project portfolios. Empirical testing of the methodology is identified as a direction for further research.

Development Service Industry Management(4)
Khmelnytskyi National University (UA), Kyiv National Economic University named after Vadym Hetman (UA)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon