System Value and Investor Incentives for Planned Nuclear Power in Uzbekistan: A Capacity-Expansion and Cournot Analysis
Uzbekistan began building its first nuclear plant, at Farish, in 2026 while moving from a single-buyer model to a wholesale electricity market. Part of the plant’s value may accrue to the single buyer, which procures peaking capacity outside the market, and not to its owner. This study quantifies that division. A PLEXOS capacity-expansion model for 2026–2035 was linked to a two-stage Nash–Cournot game solved for every hour, and the plant’s welfare effect was split among owner, single buyer, other producers, and consumers under three procurement rules. The planned units displaced 1700 MW of open-cycle gas turbine capacity and raised system cost by USD 892 million at a 10% real cost of capital and USD 17 million at 4%. Of a gross system value of USD 884 million, before USD 1765 million of fixed charges, the owner’s operating profit was USD 496 million and the single buyer saved USD 460 million. When procurement was held fixed, the owner captured almost all of a smaller value. What the owner does not capture reflects unremunerated capacity value, which incumbent market power narrowed slightly. Within the model, concessional finance plus a capacity payment equal to the avoided procurement covered the owner’s 2026–2035 funding shortfall.
Authors
- Soojin Park (ORCID: https://orcid.org/0000-0003-1564-5760)
- Kang-wook Cho (ORCID: https://orcid.org/0000-0001-8615-645X)
- Dilnavoz Turaeva (ORCID: https://orcid.org/0009-0008-3134-5489)
Institutions
- Korea Electric Power Corporation (South Korea) (KR)
Publication Details
- Journal
- Energies
- Published
- 2026-11-26
- DOI
- https://doi.org/10.3390/en19235736
- Primary Topic
- Electric Power System Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00