The Persistence Index: Five Warning Signs and the Point of Obsolescence
Many problems stay unsolved long after a workable fix exists. The Persistence Index is a short sheet for seeing why. It scores eight forces as a tug of war: on each one, does the weight sit on the people who decide the fix, or on the people who live with the problem? Beside the score it records how long the problem has been left to run, counted in generations. It also names the point of obsolescence: the moment the approach itself, not the problem, has become what needs changing. The sheet is applied to a set of cases, from Flint's water to leaded gasoline. The paper closes with what to do when a fix is made in secret, with a protocol for protecting yourself and your people when the weight sits on you, and with a redo for the people who decide. It is an early-warning tool, not a verdict. Two files: the paper, and a blank scoring sheet to print and run on your own cases.
Authors
- Andrew Delgado
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-26
- DOI
- https://doi.org/10.5281/zenodo.24572814
- Primary Topic
- Complex Systems and Decision Making
- Type
- article
- Field-Weighted Citation Impact
- 0.00