Physical Stock Falls Short While the System Still Says “Available” Median IT Solutions Private Limited
Accurate inventory records underpin purchasing, project scheduling and customer delivery, yet recorded balances often differ from the stock physically available. This case study examines such differences observed during an Inventory Management and Operations internship at Median IT Solutions Private Limited (8 July–8 August 2026). Using a descriptive case-study approach, system balances were compared with physical counts for three equipment categories. Hikvision CCTV cameras showed 36 units in the system against 28 found (a shortage of 8 units, 22.22%); 12MP memory cards showed 10 against 8 (2 units, 20%); and fire-alarm speakers showed 16 against 14 (2 units, 12.5%), giving 10 unaccounted units in total. The reasons reported were workers taking company assets, neglect of equipment by some workers and inadequate supervision at the site. Read against the literature on inventory record inaccuracy and internal control, the findings point to weaknesses in custody, handover documentation and supervision rather than to a single data error. The paper sets out a five-phase management response (verify, reconcile, correct, prevent and monitor), together with process control points, a SWOT analysis, recommended inventory techniques and performance indicators. Because the original ledgers, movement documents and item values were not available, the findings are descriptive and the causes remain reported rather than independently verified. The case is intended to support discussion of operational control in project-based technology and security-equipment companies.
Authors
- Bhojraj Shewale
- Dhaneshwar Vishwakarma
Institutions
- Amity University Mumbai (IN)
Publication Details
- Journal
- Iconic Research and Engineering Journals
- Published
- 2026-11-26
- DOI
- https://doi.org/10.64388/ire1725828
- Primary Topic
- Supply Chain and Inventory Management
- Type
- article
- Field-Weighted Citation Impact
- 0.00