Stage-Resolved Explainability Workload and Dependence-Aware Performance Assessment in PM₂.₅ Forecasting: A Multi-Criteria Decision Framework
Operational environmental forecasting requires more than accurate predictions: model fitting, inference and post-hoc explanation create distinct computational demands, while serially correlated observations complicate performance comparisons. This study develops a stage-resolved explainability framework that combines forecast error, explanation workload, performance uncertainty and Pareto-based selection. An initial five-model evaluation used 420,768 hourly records from 12 Beijing monitoring stations. Random Forest achieved R² = 0.9418 and LightGBM R² = 0.9397; explanation-to-prediction time ratios for 50 observations were 130.9, 38.5 and 11.3 for Random Forest, LightGBM and XGBoost. An independent experiment fitted new Random Forest and LightGBM configurations and evaluated both against one-hour persistence on 16,558 matched test cases. Their root mean squared errors were 26.78 µg/m³, compared with 27.26 µg/m³ for persistence. Synchronized 24-hour moving-block resampling (1,000 replications) and paired heteroskedasticity- and autocorrelation-consistent tests did not demonstrate a statistically detectable difference in squared loss (p > 0.05). The experiments are interpreted separately because their model configurations and timing workloads differ. The proposed framework makes explanation frequency an explicit operational decision variable and prevents small forecast improvements from being evaluated independently of computational cost and temporal dependence.
Authors
- Agastine A
- Badhri Narayanaa P
Publication Details
- Journal
- Research Square
- Published
- 2026-11-26
- DOI
- https://doi.org/10.21203/rs.3.rs-11428615/v1
- Primary Topic
- Air Quality Monitoring and Forecasting
- Type
- preprint