METAHEURISTIC-OPTIMIZED ANN FOR SCHEDULE OVERRUN PREDICTION: A COMPARATIVE EVALUATION OF PSO, GA, AND MVO IN EGYPTIAN CONSTRUCTION PROJECTS
This study presents a comparative evaluation of Artificial Neural Network (ANN) models optimized through Genetic Algorithm (GA), Particle Swarm Optimization (PSO), and Multi-Verse Optimization (MVO) to predict construction project schedule overruns. Nine critical factors, previously identified through the Analytical Hierarchy Process (AHP) and Pareto analysis, were used as inputs. A dataset comprising 104 real construction projects from Egypt was used to develop three hybrid models (ANN–GA, ANN–PSO, and ANN–MVO) in MATLAB. The same input factors and ANN architecture were used for all three models to provide a consistent basis for comparison. Performance was evaluated using the Normalized Mean Squared Error (NMSE) through 5-fold cross-validation, 10 independent runs, and external testing.The ANN–PSO model achieved the best predictive performance, with the lowest mean test NMSE of 0.086 ± 0.040. The ANN–GA and ANN–MVO models recorded 0.199 ± 0.079 and 0.439 ± 0.226, respectively. Thus, GA clearly outperformed MVO, whereas PSO provided the most accurate predictions among the evaluated approaches. The findings highlight the importance of metaheuristic algorithm selection in ANN-based schedule overrun prediction and provide evidence for selecting suitable optimization approaches in construction project management.
Authors
- Ann E. El-Malt
- Hatem S. El-Behairy
- Khaled A Hamdy
Institutions
- Ain Shams University (EG)
- Higher Technological Institute (EG)
Publication Details
- Journal
- Journal of Al-Azhar University Engineering Sector
- Published
- 2026-11-26
- DOI
- https://doi.org/10.21608/auej.2026.522424.2211
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00