Adaptive Grouting Pressure Control in Fractured Rock Masses Using Data-Driven Grey-Box Modeling and DDPG–PID: A Simulation Study
During curtain grouting, changes in grout take affect how quickly borehole-mouth pressure reaches its setpoint and whether the pressure overshoots. We identified a pressure flow model in stage 1 of borehole S-413 at the Dongzhuang project and used deep deterministic policy gradient (DDPG) to select gains for an incremental proportional–integral–derivative (PID) controller. With the model coefficients fixed, we evaluated the full-stage response using the stage 2 data (18 time points; FIT: 82.06%). In five step-response simulations on the training model (1–5 MPa), DDPG–PID settled in 69 s on average with zero sampled overshoot, compared with 171 s for fixed-gain PID. In simulations of a five-stage pressure schedule, the root-mean-square tracking error was 0.034 MPa for DDPG–PID, 0.114 MPa for fixed-gain PID and 0.080 MPa for fuzzy PID. In separate matched transfer tests, the policy settled at all five setpoints on stage 1 of the neighboring borehole S-417 without retraining, with an approximately 7% increase in mean settling time relative to the training model.
Authors
- Shangxin Feng (ORCID: https://orcid.org/0000-0003-0569-9845)
- Xinzhe Li
- Xichao Wang
- Yang Kong (ORCID: https://orcid.org/0009-0004-2623-8946)
- Jianxi Ren
Institutions
- Xi'an University of Science and Technology (CN)
- Nanjing Hydraulic Research Institute (CN)
Publication Details
- Journal
- Mathematics
- Published
- 2026-11-26
- DOI
- https://doi.org/10.3390/math14234356
- Primary Topic
- Grouting, Rheology, and Soil Mechanics
- Type
- article
- Field-Weighted Citation Impact
- 0.00