The Economics of Electromagnetic Lunar Launch Infrastructure: Capital Formation, Unit Costs, Industrial Demand, and the Price of Moving Mass Beyond Earth

The Electromagnetic Rail Lunar Launch System (EMRLLS), investigated by Gregory A. (Gregg) Koumbis, converts stored electrical energy into surface launch velocity and links the resulting cargo trajectories to orbital capture and depot services. This paper evaluates the economic proposition, not the engineering readiness of the proposed system. A deliberately speculative 2030 capital baseline of $2.3125 billion produces a modeled levelized cost of $1,585 per successfully delivered useful kilogram at 250 tonnes annually, but $14,226/kg at 25 tonnes. Against an illustrative $5,000/kg chemical-ascent alternative, the base case crosses its modeled unit-cost threshold at roughly 73 tonnes annually. This is not a prediction of market demand or a guaranteed break-even date. If Earth-delivered construction hardware rises from 30 tonnes at $20,000/kg to 30 tonnes at $100,000/kg, the estimated initial capital rises to $5.31 billion and the modeled threshold rises to approximately 167 tonnes per year. The central finding is that installed mass, verified cargo demand, system availability, and retrieval reliability dominate economic viability; the modelled unit cost is highly sensitive to installation mass. Across the paper's own installation-mass band of 100 to 600 tonnes, the modelled threshold runs from about 128 to 522 tonnes a year, so the base case's 73 tonnes lies below that interval rather than inside it. Energy efficiency is necessary but insufficient. Inflation and technological learning projections through 2060 are conditional illustrations, not forecasts. [1–6] Method note: Cost projections address hypothetical installations of functionally equivalent scope. They do not constitute a time-dependent lunar cargo-demand forecast, a financing cash-flow model, or a prediction of commercial revenues.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-26
DOI
https://doi.org/10.5281/zenodo.24567496
Primary Topic
Space exploration and regulation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

The Economics of Electromagnetic Lunar Launch Infrastructure: Capital Formation, Unit Costs, Industrial Demand, and the Price of Moving Mass Beyond Earth

George Pullen, Samson Williams
Zenodo (CERN European Organization for Nuclear Research)
Space exploration and regulation
article

The Economics of Electromagnetic Lunar Launch Infrastructure: Capital Formation, Unit Costs, Industrial Demand, and the Price of Moving Mass Beyond Earth

George Pullen, Samson Williams
article en

Abstract

The Electromagnetic Rail Lunar Launch System (EMRLLS), investigated by Gregory A. (Gregg) Koumbis, converts stored electrical energy into surface launch velocity and links the resulting cargo trajectories to orbital capture and depot services. This paper evaluates the economic proposition, not the engineering readiness of the proposed system. A deliberately speculative 2030 capital baseline of $2.3125 billion produces a modeled levelized cost of $1,585 per successfully delivered useful kilogram at 250 tonnes annually, but $14,226/kg at 25 tonnes. Against an illustrative $5,000/kg chemical-ascent alternative, the base case crosses its modeled unit-cost threshold at roughly 73 tonnes annually. This is not a prediction of market demand or a guaranteed break-even date. If Earth-delivered construction hardware rises from 30 tonnes at $20,000/kg to 30 tonnes at $100,000/kg, the estimated initial capital rises to $5.31 billion and the modeled threshold rises to approximately 167 tonnes per year. The central finding is that installed mass, verified cargo demand, system availability, and retrieval reliability dominate economic viability; the modelled unit cost is highly sensitive to installation mass. Across the paper's own installation-mass band of 100 to 600 tonnes, the modelled threshold runs from about 128 to 522 tonnes a year, so the base case's 73 tonnes lies below that interval rather than inside it. Energy efficiency is necessary but insufficient. Inflation and technological learning projections through 2060 are conditional illustrations, not forecasts. [1–6] Method note: Cost projections address hypothetical installations of functionally equivalent scope. They do not constitute a time-dependent lunar cargo-demand forecast, a financing cash-flow model, or a prediction of commercial revenues.

Zenodo (CERN European Organization for Nuclear Research)
Space exploration and regulation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon