KrakaWi at FID: The July Sloanea Prognosis Audited. A reused vessel, a capped tax holiday and a far stronger project: what the numbers published on 26 November 2026 say about GLIAG's 2 July 2026 screening model, and what they mean for Suriname

GLIAG Golden Lane Intelligence · Suriname · Block 52 · 26 November 2026 On 26 November 2026 PETRONAS and Staatsolie took the Final Investment Decision for the Sloanea gas field in Block 52, offshore Suriname, now named KrakaWi ("supports us" in Sranan Tongo): four production wells, subsea infrastructure and an existing PETRONAS floating LNG unit of about 1.5 MTPA, for an initial investment of US$1.6 billion, 97 bcm of recoverable gas, a 25-year life and first gas in mid-2030. This essay audits GLIAG's 2 July 2026 Sloanea screening prognosis against the published FID terms, item by item. The essay documents: (1) the published FID record from the operators' joint release, PETRONAS, the Government of Suriname and the press; (2) a 23-item audit of the July prognosis (10 confirmed, 8 revised, 5 corrected; about 10/4/9 on a strict reading); (3) five errata in the July GLIAGOGRAPH; (4) a re-engineered and independently reproduced screening model: project IRR 19.4% without and 22.2% with the capped tax holiday at US$10/MMBtu, NPV10 US$1.56 billion, breakeven US$5.5–5.9/MMBtu, State take US$6.07 billion before profit gas (a floor); (5) the capped holiday that ends at 2x investment recovered; (6) the existing-vessel capex signal, with a US$3.5 billion new-build stress case that brings the IRR to 10.9%; (7) an illustrative profit-gas switch; (8) a gas balance showing about 1.5 Tcf of recoverable gas outside the 25-year FLNG plan; (9) the Gas-to-Shore conditions for the second gas project; and (10) a FACT · MISSING · GLIAG JUDGEMENT · TRIGGER evidence table. Web edition: petroleumenergyinsights.com. Files: essay PDF (version of record), GLIAGOGRAPH-2026-1126-KRW-01 (PNG and JPG) and Figures 1–5.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-26
DOI
https://doi.org/10.5281/zenodo.24570695
Primary Topic
Capital Investment and Risk Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

KrakaWi at FID: The July Sloanea Prognosis Audited. A reused vessel, a capped tax holiday and a far stronger project: what the numbers published on 26 November 2026 say about GLIAG's 2 July 2026 screening model, and what they mean for Suriname

Marcel P.T. Chin-A-Lien
Zenodo (CERN European Organization for Nuclear Research)
Capital Investment and Risk Analysis
article

KrakaWi at FID: The July Sloanea Prognosis Audited. A reused vessel, a capped tax holiday and a far stronger project: what the numbers published on 26 November 2026 say about GLIAG's 2 July 2026 screening model, and what they mean for Suriname

Marcel P.T. Chin-A-Lien
article en

Abstract

GLIAG Golden Lane Intelligence · Suriname · Block 52 · 26 November 2026 On 26 November 2026 PETRONAS and Staatsolie took the Final Investment Decision for the Sloanea gas field in Block 52, offshore Suriname, now named KrakaWi ("supports us" in Sranan Tongo): four production wells, subsea infrastructure and an existing PETRONAS floating LNG unit of about 1.5 MTPA, for an initial investment of US$1.6 billion, 97 bcm of recoverable gas, a 25-year life and first gas in mid-2030. This essay audits GLIAG's 2 July 2026 Sloanea screening prognosis against the published FID terms, item by item. The essay documents: (1) the published FID record from the operators' joint release, PETRONAS, the Government of Suriname and the press; (2) a 23-item audit of the July prognosis (10 confirmed, 8 revised, 5 corrected; about 10/4/9 on a strict reading); (3) five errata in the July GLIAGOGRAPH; (4) a re-engineered and independently reproduced screening model: project IRR 19.4% without and 22.2% with the capped tax holiday at US$10/MMBtu, NPV10 US$1.56 billion, breakeven US$5.5–5.9/MMBtu, State take US$6.07 billion before profit gas (a floor); (5) the capped holiday that ends at 2x investment recovered; (6) the existing-vessel capex signal, with a US$3.5 billion new-build stress case that brings the IRR to 10.9%; (7) an illustrative profit-gas switch; (8) a gas balance showing about 1.5 Tcf of recoverable gas outside the 25-year FLNG plan; (9) the Gas-to-Shore conditions for the second gas project; and (10) a FACT · MISSING · GLIAG JUDGEMENT · TRIGGER evidence table. Web edition: petroleumenergyinsights.com. Files: essay PDF (version of record), GLIAGOGRAPH-2026-1126-KRW-01 (PNG and JPG) and Figures 1–5.

Zenodo (CERN European Organization for Nuclear Research)
Capital Investment and Risk Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
KrakaWi at FID: The July Sloanea Prognosis Audited. A reused vessel, a capped tax holiday and a far stronger project: what the numbers published on 26 November 2026 say about GLIAG's 2 July 2026 screening model, and what they mean for Suriname — Marcel P.T. Chin-A-Lien · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS