Data Integration for Production Monitoring in Labor-Intensive Offsite Manufacturing: A Human-in-the-Loop Digital Shadow

Data-driven monitoring and optimization require execution-time records that many labor-intensive offsite plants lack, because their records mark completions without timestamps. This study designs, implements and verifies a data-integration layer for a three-line bathroom-module factory. Operators declare task starts and finishes on tablets, and each declaration is reconciled into explicit time magnitudes and labeled by origin and evidence tier before reaching line balancing, discrete-event simulation and backward scheduling. The architecture operates as an operator-mediated digital shadow: the physical-to-digital flow is automated once an operator declares an event, and every proposal returned to the plant requires authorization by the production manager. As raw production records could not be released, the system was exercised on 1880 prototype task durations transformed from plant measurements and on 50,630 generated observations. Reconciliation exposed overstatements of 7 to 18 min that adding concurrent task durations would cause at three stations. The simulation engine matched an analytical bound exactly in eight typologies and within 0.4% in seven project mixes. The balancing module recovered a deliberately built opportunity, lowering the modeled bottleneck from 80 to 65 min in three typologies under the adopted station-load convention, a reduction that falls to 1 min in the typology examined if no task overlap is assumed. In a stress scenario, the scheduler flagged 804 of 1815 units as infeasible. These results verify functional behavior on selected scenarios, not operational performance in the plant. The layer makes data sufficiency explicit and prepares statistical monitoring once measured samples accumulate.

Authors

Institutions

Publication Details

Journal
Processes
Published
2026-11-25
DOI
https://doi.org/10.3390/pr14233802
Primary Topic
Digital Transformation in Industry
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Data Integration for Production Monitoring in Labor-Intensive Offsite Manufacturing: A Human-in-the-Loop Digital Shadow

Alberto Cerezo-Narváez, Álvaro Ayala-Martín
2 links
Processes
Digital Transformation in Industry
article

Data Integration for Production Monitoring in Labor-Intensive Offsite Manufacturing: A Human-in-the-Loop Digital Shadow

Alberto Cerezo-Narváez, Álvaro Ayala-Martín
article en

Abstract

Data-driven monitoring and optimization require execution-time records that many labor-intensive offsite plants lack, because their records mark completions without timestamps. This study designs, implements and verifies a data-integration layer for a three-line bathroom-module factory. Operators declare task starts and finishes on tablets, and each declaration is reconciled into explicit time magnitudes and labeled by origin and evidence tier before reaching line balancing, discrete-event simulation and backward scheduling. The architecture operates as an operator-mediated digital shadow: the physical-to-digital flow is automated once an operator declares an event, and every proposal returned to the plant requires authorization by the production manager. As raw production records could not be released, the system was exercised on 1880 prototype task durations transformed from plant measurements and on 50,630 generated observations. Reconciliation exposed overstatements of 7 to 18 min that adding concurrent task durations would cause at three stations. The simulation engine matched an analytical bound exactly in eight typologies and within 0.4% in seven project mixes. The balancing module recovered a deliberately built opportunity, lowering the modeled bottleneck from 80 to 65 min in three typologies under the adopted station-load convention, a reduction that falls to 1 min in the typology examined if no task overlap is assumed. In a stress scenario, the scheduler flagged 804 of 1815 units as infeasible. These results verify functional behavior on selected scenarios, not operational performance in the plant. The layer makes data sufficiency explicit and prepares statistical monitoring once measured samples accumulate.

ProcessesVol. 14(23)
Universidad de Cádiz (ES)
Industry, innovation and infrastructure, Decent work and economic growth
Digital Transformation in Industry
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon