Contiguous Monotone Moldable Job Scheduling

In this paper, we address the Contiguous Monotone Moldable Job Scheduling (CMMJS) problem, where a set of jobs must be scheduled on parallel machines to minimize the overall makespan. Each job is characterized by a processing time function mapping the number of assigned machines to a processing time, such that the corresponding work area function is non-decreasing. Building upon the framework and critical cases identified by Jansen and Ohnesorge (2026), we present an improved analytical approach that yields a tighter approximation ratio of $\frac{2\sqrt{e}}{2\sqrt{e}-1}+\varepsilon \approx 1.4353+\varepsilon$ with a running time of $O(nm\log \frac{1}{\varepsilon})$. We prove that this worst-case analysis is essentially tight by providing a matching lower bound instance. This approximation ratio applies not only to contiguous scheduling but also to the non-contiguous variant of the problem. Finally, we demonstrate that our improved bounds extend naturally to heterogeneous environments; seamlessly integrating our results into an existing dual approximation framework for combined CPU/GPU scheduling by Germann~et~al.\ (2024) yields an improved overall approximation ratio of $\frac{2\sqrt{e}}{2\sqrt{e}-1}+\varepsilon$ for the joint problem.

Authors

Publication Details

Journal
arXiv
Published
2026-11-24
DOI
https://doi.org/10.48550/arxiv.2611.32688
Primary Topic
Scheduling and Optimization Algorithms
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Contiguous Monotone Moldable Job Scheduling

Felix Ohnesorge, Klaus Jansen, Bennet Edler
arXiv
Scheduling and Optimization Algorithms
preprint

Contiguous Monotone Moldable Job Scheduling

Felix Ohnesorge, Klaus Jansen, Bennet Edler
preprint en

Abstract

In this paper, we address the Contiguous Monotone Moldable Job Scheduling (CMMJS) problem, where a set of jobs must be scheduled on parallel machines to minimize the overall makespan. Each job is characterized by a processing time function mapping the number of assigned machines to a processing time, such that the corresponding work area function is non-decreasing. Building upon the framework and critical cases identified by Jansen and Ohnesorge (2026), we present an improved analytical approach that yields a tighter approximation ratio of $\frac{2\sqrt{e}}{2\sqrt{e}-1}+\varepsilon \approx 1.4353+\varepsilon$ with a running time of $O(nm\log \frac{1}{\varepsilon})$. We prove that this worst-case analysis is essentially tight by providing a matching lower bound instance. This approximation ratio applies not only to contiguous scheduling but also to the non-contiguous variant of the problem. Finally, we demonstrate that our improved bounds extend naturally to heterogeneous environments; seamlessly integrating our results into an existing dual approximation framework for combined CPU/GPU scheduling by Germann~et~al.\ (2024) yields an improved overall approximation ratio of $\frac{2\sqrt{e}}{2\sqrt{e}-1}+\varepsilon$ for the joint problem.

arXiv
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon