AI-powered predictive digital twin framework for predictive cost control and intelligent deviation diagnosis in BIM-based construction

Construction projects frequently experience cost overruns, schedule delays, and inefficient resource utilization because conventional monitoring approaches have limited capability to identify complex deviation patterns. This study proposes an AI-driven predictive BIM-based digital twin framework for cost deviation detection, risk assessment, and interpretable decision support in construction project management. The framework uses the BIM-AI Integrated Dataset containing 1200 project records and 28 attributes covering financial, scheduling, structural, environmental, resource, safety, and monitoring information. Data preprocessing includes mean imputation, IQR-based outlier treatment, Min–Max normalization, and one-hot encoding, followed by deviation labelling using 10% cost or duration thresholds. Interpretable Cost Ratio, Duration Ratio, and Resource Intensity features are incorporated, and Random Forest is employed for predictive classification and feature importance analysis. The dataset is divided into an 80% development set and a 20% locked test set, with stratified five-fold cross-validation and repeated random seeds used for evaluation. The proposed Random Forest achieves 95.6% accuracy, 95.9% precision, 97.9% recall, 96.9% F1-score, 98.2% ROC-AUC, 90.3% specificity, and 95.9% PR-AUC. Equipment Utilization, Anomaly Score, and Material Usage are identified as the most influential predictors, with bootstrap analysis and SHAP interpretation supporting stable and transparent feature contributions. Although ConvLSTM attains higher accuracy, Random Forest provides a strong balance of predictive performance and interpretability. The framework demonstrates potential for proactive construction cost control and deviation diagnosis; however, evaluation remains offline and based on a single public dataset. Real-time BIM synchronization, IoT integration, and validation using real construction projects are required for practical deployment.

Authors

Institutions

Publication Details

Journal
Discover Artificial Intelligence
Published
2026-11-25
DOI
https://doi.org/10.1007/s44163-026-02235-7
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

AI-powered predictive digital twin framework for predictive cost control and intelligent deviation diagnosis in BIM-based construction

Jie Zhu, Li Ma, Yao Xu
4 links
Discover Artificial Intelligence
BIM and Construction Integration
article

AI-powered predictive digital twin framework for predictive cost control and intelligent deviation diagnosis in BIM-based construction

Jie Zhu, Li Ma, Yao Xu
article en

Abstract

Construction projects frequently experience cost overruns, schedule delays, and inefficient resource utilization because conventional monitoring approaches have limited capability to identify complex deviation patterns. This study proposes an AI-driven predictive BIM-based digital twin framework for cost deviation detection, risk assessment, and interpretable decision support in construction project management. The framework uses the BIM-AI Integrated Dataset containing 1200 project records and 28 attributes covering financial, scheduling, structural, environmental, resource, safety, and monitoring information. Data preprocessing includes mean imputation, IQR-based outlier treatment, Min–Max normalization, and one-hot encoding, followed by deviation labelling using 10% cost or duration thresholds. Interpretable Cost Ratio, Duration Ratio, and Resource Intensity features are incorporated, and Random Forest is employed for predictive classification and feature importance analysis. The dataset is divided into an 80% development set and a 20% locked test set, with stratified five-fold cross-validation and repeated random seeds used for evaluation. The proposed Random Forest achieves 95.6% accuracy, 95.9% precision, 97.9% recall, 96.9% F1-score, 98.2% ROC-AUC, 90.3% specificity, and 95.9% PR-AUC. Equipment Utilization, Anomaly Score, and Material Usage are identified as the most influential predictors, with bootstrap analysis and SHAP interpretation supporting stable and transparent feature contributions. Although ConvLSTM attains higher accuracy, Random Forest provides a strong balance of predictive performance and interpretability. The framework demonstrates potential for proactive construction cost control and deviation diagnosis; however, evaluation remains offline and based on a single public dataset. Real-time BIM synchronization, IoT integration, and validation using real construction projects are required for practical deployment.

Discover Artificial IntelligenceVol. 6(1)
Asia University (JP), Xi'an Eurasia University (CN)
Industry, innovation and infrastructure
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
AI-powered predictive digital twin framework for predictive cost control and intelligent deviation diagnosis in BIM-based construction — Jie Zhu, Li Ma, et al. · Discover Artificial Intelligence (2026) | TGRS Research Map | TGRS