Analisis Bill of Quantities (BOQ) Sebagai Alat Pengendalian Biaya Proyek pada PT Telkom Akses Jember

In the midst of rapid digital transformation, efficient cost management has become crucial for telecommunication infrastructure companies to maintain business sustainability and competitiveness. This research aims to analyze the effectiveness of the Bill of Quantities (BOQ) as a project cost control instrument at PT Telkom Akses Jember. The massive increase in demand for fiber optic networks necessitates stringent budget management to avoid the risk of cost overruns that could lead to financial losses. The method employed is descriptive quantitative with a case study approach, utilizing project report documentation and variance analysis to compare the budget costs in the indicative BOQ with the actual project costs in order to identify differences (variances) that are favorable or unfavorable.. The results indicate that the implementation of BOQ as a control tool has been effective, as evidenced by a favorable variance. The total realized project cost of Rp3,399,774 appears to be lower compared to the budget in the indicative BOQ of Rp6,261,203. However, deviations were found in the form of differences in material volumes and unit prices due to unpredictable field dynamics at the Banyuwangi site during the initial planning stage. This study concludes that while the BOQ successfully maintains financial efficiency, technical accuracy needs to be enhanced to optimize the overall cost control function. These findings provide a basis for the company to adjust estimation standards to improve the accuracy of future budget planning.

Authors

Institutions

Publication Details

Journal
AKUNTANSI 45
Published
2026-11-25
DOI
https://doi.org/10.30640/akuntansi45.v7i2.8334
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Analisis Bill of Quantities (BOQ) Sebagai Alat Pengendalian Biaya Proyek pada PT Telkom Akses Jember

Mutmainnah Mutmainnah, Intan Nuraini, Ahmad Zidan Hidayat, Zakiyyahul Karimah
AKUNTANSI 45
Construction Project Management and Performance
article

Analisis Bill of Quantities (BOQ) Sebagai Alat Pengendalian Biaya Proyek pada PT Telkom Akses Jember

Mutmainnah Mutmainnah, Intan Nuraini, Ahmad Zidan Hidayat, Zakiyyahul Karimah
article en

Abstract

In the midst of rapid digital transformation, efficient cost management has become crucial for telecommunication infrastructure companies to maintain business sustainability and competitiveness. This research aims to analyze the effectiveness of the Bill of Quantities (BOQ) as a project cost control instrument at PT Telkom Akses Jember. The massive increase in demand for fiber optic networks necessitates stringent budget management to avoid the risk of cost overruns that could lead to financial losses. The method employed is descriptive quantitative with a case study approach, utilizing project report documentation and variance analysis to compare the budget costs in the indicative BOQ with the actual project costs in order to identify differences (variances) that are favorable or unfavorable.. The results indicate that the implementation of BOQ as a control tool has been effective, as evidenced by a favorable variance. The total realized project cost of Rp3,399,774 appears to be lower compared to the budget in the indicative BOQ of Rp6,261,203. However, deviations were found in the form of differences in material volumes and unit prices due to unpredictable field dynamics at the Banyuwangi site during the initial planning stage. This study concludes that while the BOQ successfully maintains financial efficiency, technical accuracy needs to be enhanced to optimize the overall cost control function. These findings provide a basis for the company to adjust estimation standards to improve the accuracy of future budget planning.

AKUNTANSI 45Vol. 7(2)
Universitas Islam Negeri Kiai Haji Achmad Siddiq Jember (ID)
Industry, innovation and infrastructure
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon