Electronic procurement planning and procurement performance in Wakiso District Local Government, Uganda. A cross-sectional study.

Background: Procurement planning is the first stage of the procurement cycle, so weaknesses in it are carried into later stages. This study examined the contribution of electronic procurement planning to procurement performance in Wakiso District Local Government. Methodology: A cross-sectional correlational design with a convergent mixed-methods approach was used. Fieldwork was carried out on 25–27 October 2026. Data came from 80 of 89 sampled staff (response rate 89.9%) through a five-point Likert questionnaire, from interviews with three key informants, and from a review of procurement records for FY 2021/22 to FY 2025/26. Analysis used descriptive statistics, Pearson and Spearman correlations, regression, and thematic analysis. Results: Most respondents were male (63.7%), aged 25–54 years (85.0%), held a bachelor's, postgraduate diploma, or master's degree (78.8%), and had used e-GP (92.5%). Electronic planning was rated moderate (M = 3.27) and procurement performance high (M = 3.54). Electronic planning was positively but weakly related to performance (r = .358, p = .001), explaining 12.8% of its variance. It was related most strongly to transparency and accountability (r = .389) and timeliness (r = .350), but not to value for money. Records showed that average requisition-to-award time rose from 95 to 110 days. Heads of user departments rated planning lowest (M = 3.05), compared with PDU staff (M = 3.71). Conclusion: Electronic procurement planning is positively but weakly related to procurement performance. Its contribution is limited when requisitions are late, plans are not updated, and inputs are inaccurate. Recommendation: The Chief Administrative Officer and the PDU should set an annual deadline for submitting requirements to the e-GP planning module, update plans whenever priorities change, and provide role-based refresher training. Budget coding should also be aligned with the IFMS.

Authors

Publication Details

Journal
AfroGlobal Perspectives
Published
2026-11-24
DOI
https://doi.org/10.70572/3k17wb47
Primary Topic
Public Procurement and Policy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Electronic procurement planning and procurement performance in Wakiso District Local Government, Uganda. A cross-sectional study.

Edmand Bakashaba, Moses Muhwezi, Stella Nakanwagi
AfroGlobal Perspectives
Public Procurement and Policy
article

Electronic procurement planning and procurement performance in Wakiso District Local Government, Uganda. A cross-sectional study.

Edmand Bakashaba, Moses Muhwezi, Stella Nakanwagi
article en

Abstract

Background: Procurement planning is the first stage of the procurement cycle, so weaknesses in it are carried into later stages. This study examined the contribution of electronic procurement planning to procurement performance in Wakiso District Local Government. Methodology: A cross-sectional correlational design with a convergent mixed-methods approach was used. Fieldwork was carried out on 25–27 October 2026. Data came from 80 of 89 sampled staff (response rate 89.9%) through a five-point Likert questionnaire, from interviews with three key informants, and from a review of procurement records for FY 2021/22 to FY 2025/26. Analysis used descriptive statistics, Pearson and Spearman correlations, regression, and thematic analysis. Results: Most respondents were male (63.7%), aged 25–54 years (85.0%), held a bachelor's, postgraduate diploma, or master's degree (78.8%), and had used e-GP (92.5%). Electronic planning was rated moderate (M = 3.27) and procurement performance high (M = 3.54). Electronic planning was positively but weakly related to performance (r = .358, p = .001), explaining 12.8% of its variance. It was related most strongly to transparency and accountability (r = .389) and timeliness (r = .350), but not to value for money. Records showed that average requisition-to-award time rose from 95 to 110 days. Heads of user departments rated planning lowest (M = 3.05), compared with PDU staff (M = 3.71). Conclusion: Electronic procurement planning is positively but weakly related to procurement performance. Its contribution is limited when requisitions are late, plans are not updated, and inputs are inaccurate. Recommendation: The Chief Administrative Officer and the PDU should set an annual deadline for submitting requirements to the e-GP planning module, update plans whenever priorities change, and provide role-based refresher training. Budget coding should also be aligned with the IFMS.

AfroGlobal Perspectives
Public Procurement and Policy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon