BRIDGING INFRASTRUCTURE AND EQUITY: ASSESSING KENYA’S NAIROBI EXPRESSWAY PUBLIC-PRIVATE PARTNERSHIP PROJECT

Kenya’s infrastructure deficit and constrained public finances have made Public–Private Partnerships (PPPs) a central instrument for delivering large-scale projects. This article assesses the implications of PPPs for infrastructure development in Kenya, using the Nairobi Expressway, a 30-year Build–Operate–Transfer concession awarded to the China Road and Bridge Corporation (CRBC), the project is to be constructed for 3 years and 27-year operation as a case study. Anchored in Dependency Theory, the study sought to (i) assess the implications of PPPs for infrastructure development, (ii) examine the distributional impacts of the Expressway on Kenyans, and (iii) analyse the government’s role in ensuring that PPPs benefit citizens. A mixed-methods design was adopted. Structured questionnaires were administered to motorists, business owners and residents selected through stratified random sampling, while semi-structured interviews were held with purposively selected officials from the Ministry of Transport, the Kenya National Highways Authority (KeNHA), the PPP Unit and CRBC the submissions analyzed in thematic form. Of 80 questionnaires issued, 60 were completed (75% response rate). Data were analyzed using descriptive statistics and thematic analysis. Most respondents agreed that PPPs improve infrastructure quality (71.6%) and timely delivery (70.0%), and that the Expressway improved traffic flow (81.7%) and stimulated nearby business activity (63.3%). However, 58.3% disagreed that tolls are affordable, only 63.4% agreed that PPPs reduce the government’s financial burden, and just 41.7% agreed that policies ensure benefits reach citizens. Weak transparency, limited public participation and gaps in institutional capacity emerged as the main constraints. The study concludes that PPPs are a viable model for closing Kenya’s infrastructure gap, but only where they are supported by strong institutions, transparent contracting, affordability safeguards and meaningful citizen participation.

Authors

Publication Details

Journal
AgEcon Search (University of Minnesota, USA)
Published
2026-11-25
DOI
https://doi.org/10.22004/ag.econ.417467
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

BRIDGING INFRASTRUCTURE AND EQUITY: ASSESSING KENYA’S NAIROBI EXPRESSWAY PUBLIC-PRIVATE PARTNERSHIP PROJECT

Kevin Kiprono Kirui, chelang'a L.R Maiyo
3 links
AgEcon Search (University of Minnesota, USA)
Public-Private Partnership Projects
article

BRIDGING INFRASTRUCTURE AND EQUITY: ASSESSING KENYA’S NAIROBI EXPRESSWAY PUBLIC-PRIVATE PARTNERSHIP PROJECT

Kevin Kiprono Kirui, chelang'a L.R Maiyo
article en

Abstract

Kenya’s infrastructure deficit and constrained public finances have made Public–Private Partnerships (PPPs) a central instrument for delivering large-scale projects. This article assesses the implications of PPPs for infrastructure development in Kenya, using the Nairobi Expressway, a 30-year Build–Operate–Transfer concession awarded to the China Road and Bridge Corporation (CRBC), the project is to be constructed for 3 years and 27-year operation as a case study. Anchored in Dependency Theory, the study sought to (i) assess the implications of PPPs for infrastructure development, (ii) examine the distributional impacts of the Expressway on Kenyans, and (iii) analyse the government’s role in ensuring that PPPs benefit citizens. A mixed-methods design was adopted. Structured questionnaires were administered to motorists, business owners and residents selected through stratified random sampling, while semi-structured interviews were held with purposively selected officials from the Ministry of Transport, the Kenya National Highways Authority (KeNHA), the PPP Unit and CRBC the submissions analyzed in thematic form. Of 80 questionnaires issued, 60 were completed (75% response rate). Data were analyzed using descriptive statistics and thematic analysis. Most respondents agreed that PPPs improve infrastructure quality (71.6%) and timely delivery (70.0%), and that the Expressway improved traffic flow (81.7%) and stimulated nearby business activity (63.3%). However, 58.3% disagreed that tolls are affordable, only 63.4% agreed that PPPs reduce the government’s financial burden, and just 41.7% agreed that policies ensure benefits reach citizens. Weak transparency, limited public participation and gaps in institutional capacity emerged as the main constraints. The study concludes that PPPs are a viable model for closing Kenya’s infrastructure gap, but only where they are supported by strong institutions, transparent contracting, affordability safeguards and meaningful citizen participation.

AgEcon Search (University of Minnesota, USA)
Industry, innovation and infrastructure, Sustainable cities and communities, Peace, justice, and strong institutions
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
BRIDGING INFRASTRUCTURE AND EQUITY: ASSESSING KENYA’S NAIROBI EXPRESSWAY PUBLIC-PRIVATE PARTNERSHIP PROJECT — Kevin Kiprono Kirui, chelang'a L.R Maiyo · AgEcon Search (University of Minnesota, USA) (2026) | TGRS Research Map | TGRS