Two-Stage Stochastic–Robust Scheduling of Cascade Pumping Stations with CVaR-Based Risk Control: An Eastern Route Case Study

Day-ahead scheduling of cascade pumping stations must balance electricity costs and delivery requirements under uncertainty. This study develops a two-stage stochastic–robust scheduling framework incorporating conditional value-at-risk (CVaR). A day-ahead reference flow is linked to bounded full-trajectory recourse, with probability-weighted demand scenarios, budgeted upward price deviations, and prescribed capacity derating. CVaR measures scenario-specific worst-price costs, and robust duality yields a deterministic-equivalent linear program. In a constructed five-station benchmark with 1000 synthetic out-of-sample demand trajectories, deterministic and stochastic configurations achieved scheduling-feasibility rates of 98.5% and 99.4%, respectively, whereas price-robust configurations achieved 100%. Lower worst-price costs primarily reflected reduced protection premiums; independently generated price trajectories did not establish realized-expenditure savings. Relative to the risk-neutral stochastic–robust configuration, adding CVaR reduced evaluated CVaR at the 95% confidence level by 21.71 CNY, approximately 0.0023% of the reference tail cost, while increasing mean cost by 6.70 CNY. Sequential-information restrictions increased costs, while demand and capacity stress tests removed universal sample feasibility. Delay–storage and nonlinear-power diagnostics exposed limitations of the physical approximations. The framework supports scheduling-level risk–economy analysis, but its small tail-risk benefit and constructed-case results do not establish operational effectiveness without hydraulic and field validation.

Authors

Institutions

Publication Details

Journal
Energies
Published
2026-11-25
DOI
https://doi.org/10.3390/en19235713
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Two-Stage Stochastic–Robust Scheduling of Cascade Pumping Stations with CVaR-Based Risk Control: An Eastern Route Case Study

Guangming Zhang, Chao Lu, Zhihan Shi, Pengfei Wang
1 links
Energies
Electric Power System Optimization
article

Two-Stage Stochastic–Robust Scheduling of Cascade Pumping Stations with CVaR-Based Risk Control: An Eastern Route Case Study

Guangming Zhang, Chao Lu, Zhihan Shi, Pengfei Wang
article en

Abstract

Day-ahead scheduling of cascade pumping stations must balance electricity costs and delivery requirements under uncertainty. This study develops a two-stage stochastic–robust scheduling framework incorporating conditional value-at-risk (CVaR). A day-ahead reference flow is linked to bounded full-trajectory recourse, with probability-weighted demand scenarios, budgeted upward price deviations, and prescribed capacity derating. CVaR measures scenario-specific worst-price costs, and robust duality yields a deterministic-equivalent linear program. In a constructed five-station benchmark with 1000 synthetic out-of-sample demand trajectories, deterministic and stochastic configurations achieved scheduling-feasibility rates of 98.5% and 99.4%, respectively, whereas price-robust configurations achieved 100%. Lower worst-price costs primarily reflected reduced protection premiums; independently generated price trajectories did not establish realized-expenditure savings. Relative to the risk-neutral stochastic–robust configuration, adding CVaR reduced evaluated CVaR at the 95% confidence level by 21.71 CNY, approximately 0.0023% of the reference tail cost, while increasing mean cost by 6.70 CNY. Sequential-information restrictions increased costs, while demand and capacity stress tests removed universal sample feasibility. Delay–storage and nonlinear-power diagnostics exposed limitations of the physical approximations. The framework supports scheduling-level risk–economy analysis, but its small tail-risk benefit and constructed-case results do not establish operational effectiveness without hydraulic and field validation.

EnergiesVol. 19(23)
Nanjing Tech University (CN), Nantong Institute of Technology (CN)
Affordable and clean energy, Industry, innovation and infrastructure
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon