Risk allocation and performance in Indian highway PPPs: an empirical model comparison

Purpose Despite India’s shift from Build-Operate-Transfer (BOT) models to the Hybrid Annuity Model (HAM) for highway public–private partnerships (PPPs), limited research has jointly examined delivery performance, renegotiation and fiscal outcomes across all three concession models using a comprehensive, project-level dataset, leaving policymakers without integrated evidence on risk allocation trade-offs. This study addresses this gap. Design/methodology/approach This study analyses project-level data on award terms, costs, delays and termination/renegotiation status for 116 Indian highway PPP projects (2010–2023), compiled from the NHAI database, PPPAC database, CAG audit reports and BSE/NSE disclosures. The analysis employs descriptive statistics, logistic regression, Kaplan–Meier survival analysis with Cox proportional hazards modelling and net present value (NPV) lifecycle cost comparison. Findings Across this sample, HAM projects show substantially lower average delays (5.7 months versus 37.5 for BOT-Toll) and zero terminations across 71 projects, versus 67.6% termination for BOT-Toll, a practically, not merely statistically significant difference. Survival analysis confirms significantly different termination trajectories (log-rank p = 0.030). Completion delays are the strongest renegotiation predictor across all specifications (OR = 1.23, p < 0.001). These patterns are confounded with temporal, institutional and geographic factors, limiting causal inference. HAM costs government 1.07–1.24 times the project cost in NPV terms, a trade-off between delivery certainty and fiscal commitment. Originality/value This study contributes the first large-sample, within-country comparison of three PPP concession models under a common institutional setting, documents the soft budget constraint mechanism underlying BOT-Annuity’s renegotiation pattern and demonstrates a replicable survival-analysis-plus-NPV approach for evaluating PPP model transitions elsewhere.

Authors

Institutions

Publication Details

Journal
Built Environment Project and Asset Management
Published
2026-11-26
DOI
https://doi.org/10.1108/bepam-10-2025-0351
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Risk allocation and performance in Indian highway PPPs: an empirical model comparison

Siddhant Walia, Sneh Singh
2 links
Built Environment Project and Asset Management
Public-Private Partnership Projects
article

Risk allocation and performance in Indian highway PPPs: an empirical model comparison

Siddhant Walia, Sneh Singh
article en

Abstract

Purpose Despite India’s shift from Build-Operate-Transfer (BOT) models to the Hybrid Annuity Model (HAM) for highway public–private partnerships (PPPs), limited research has jointly examined delivery performance, renegotiation and fiscal outcomes across all three concession models using a comprehensive, project-level dataset, leaving policymakers without integrated evidence on risk allocation trade-offs. This study addresses this gap. Design/methodology/approach This study analyses project-level data on award terms, costs, delays and termination/renegotiation status for 116 Indian highway PPP projects (2010–2023), compiled from the NHAI database, PPPAC database, CAG audit reports and BSE/NSE disclosures. The analysis employs descriptive statistics, logistic regression, Kaplan–Meier survival analysis with Cox proportional hazards modelling and net present value (NPV) lifecycle cost comparison. Findings Across this sample, HAM projects show substantially lower average delays (5.7 months versus 37.5 for BOT-Toll) and zero terminations across 71 projects, versus 67.6% termination for BOT-Toll, a practically, not merely statistically significant difference. Survival analysis confirms significantly different termination trajectories (log-rank p = 0.030). Completion delays are the strongest renegotiation predictor across all specifications (OR = 1.23, p < 0.001). These patterns are confounded with temporal, institutional and geographic factors, limiting causal inference. HAM costs government 1.07–1.24 times the project cost in NPV terms, a trade-off between delivery certainty and fiscal commitment. Originality/value This study contributes the first large-sample, within-country comparison of three PPP concession models under a common institutional setting, documents the soft budget constraint mechanism underlying BOT-Annuity’s renegotiation pattern and demonstrates a replicable survival-analysis-plus-NPV approach for evaluating PPP model transitions elsewhere.

Built Environment Project and Asset Management
Manipal University Jaipur (IN)
Industry, innovation and infrastructure, Sustainable cities and communities
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon