ЕКОНОМІЧНЕ ОЦІНЮВАННЯ ТА УПРАВЛІННЯ БІЗНЕС-ПРОЄКТАМИ ПІДПРИЄМСТВ ГАЛУЗІ ІНФОРМАЦІЙНИХ ТЕХНОЛОГІЙ

The article substantiates a methodological toolkit for the economic evaluation and management of business projects of information technology (IT) enterprises, taking into account industry specifics: the dominance of labour costs, the consumption-based model of cloud spending, the prevalence of intangible outcomes, and the Diia City legal regime. Six groups of business-project management costs are distinguished by the criterion of the life-cycle stage at which a cost is actually incurred, which eliminates the double counting of technical-debt costs by separating the cost of creating technical debt during development from the cost of servicing it during operation. A stakeholder-based system of indicators is formed with an explicit algorithm: each indicator is normalised to the [0; 1] range according to its desirability direction (direct for net present value and deployment frequency, inverse for mean time to restore, technical debt, and vendor lock-in risk); weights are determined by the analytic hierarchy process with a consistency ratio not exceeding 0.10; and the integral assessment of a stakeholder group is obtained as a weighted sum. The cost-optimization model is formalised as an optimization task, that is, minimisation of total costs subject to a fixed service level, a technical-debt ceiling and a minimum acceptable quality level, with cloud resources, team size, and automation depth as decision variables; its solution procedure is organised into preparatory, main, and final stages that operationalise the FinOps cycle. The method for assessing the maturity of business projecting is made reproducible: four linguistic terms with Harrington boundaries (0–0.37, 0.37–0.63, 0.63–0.80, 0.80–1.0) and triangular membership functions are defined for each of five indicators, the base of 1024 rules is explained as four to the power of five, Mamdani inference is used, the weights obtained by the analytic hierarchy process are applied at the rule-output aggregation stage, and defuzzification is performed by the centre-of-gravity method. The numerical example given in the article is conditional and illustrative; it demonstrates the sequence of calculations and is not the result of empirical validation. The results increase the validity of managerial decisions regarding the business projects of IT enterprises, while empirical validation on a dataset of IT enterprises remains a task for further research.

Authors

Institutions

Publication Details

Journal
Market Infrastructure
Published
2026-11-25
DOI
https://doi.org/10.32782/infrastruct92-7
Primary Topic
Information Technology Governance and Strategy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

ЕКОНОМІЧНЕ ОЦІНЮВАННЯ ТА УПРАВЛІННЯ БІЗНЕС-ПРОЄКТАМИ ПІДПРИЄМСТВ ГАЛУЗІ ІНФОРМАЦІЙНИХ ТЕХНОЛОГІЙ

А. О. Калиновський, О.С. Гулько
Market Infrastructure
Information Technology Governance and Strategy
article

ЕКОНОМІЧНЕ ОЦІНЮВАННЯ ТА УПРАВЛІННЯ БІЗНЕС-ПРОЄКТАМИ ПІДПРИЄМСТВ ГАЛУЗІ ІНФОРМАЦІЙНИХ ТЕХНОЛОГІЙ

А. О. Калиновський, О.С. Гулько
article en

Abstract

The article substantiates a methodological toolkit for the economic evaluation and management of business projects of information technology (IT) enterprises, taking into account industry specifics: the dominance of labour costs, the consumption-based model of cloud spending, the prevalence of intangible outcomes, and the Diia City legal regime. Six groups of business-project management costs are distinguished by the criterion of the life-cycle stage at which a cost is actually incurred, which eliminates the double counting of technical-debt costs by separating the cost of creating technical debt during development from the cost of servicing it during operation. A stakeholder-based system of indicators is formed with an explicit algorithm: each indicator is normalised to the [0; 1] range according to its desirability direction (direct for net present value and deployment frequency, inverse for mean time to restore, technical debt, and vendor lock-in risk); weights are determined by the analytic hierarchy process with a consistency ratio not exceeding 0.10; and the integral assessment of a stakeholder group is obtained as a weighted sum. The cost-optimization model is formalised as an optimization task, that is, minimisation of total costs subject to a fixed service level, a technical-debt ceiling and a minimum acceptable quality level, with cloud resources, team size, and automation depth as decision variables; its solution procedure is organised into preparatory, main, and final stages that operationalise the FinOps cycle. The method for assessing the maturity of business projecting is made reproducible: four linguistic terms with Harrington boundaries (0–0.37, 0.37–0.63, 0.63–0.80, 0.80–1.0) and triangular membership functions are defined for each of five indicators, the base of 1024 rules is explained as four to the power of five, Mamdani inference is used, the weights obtained by the analytic hierarchy process are applied at the rule-output aggregation stage, and defuzzification is performed by the centre-of-gravity method. The numerical example given in the article is conditional and illustrative; it demonstrates the sequence of calculations and is not the result of empirical validation. The results increase the validity of managerial decisions regarding the business projects of IT enterprises, while empirical validation on a dataset of IT enterprises remains a task for further research.

Market Infrastructure(92)
Lviv Polytechnic National University (UA)
Information Technology Governance and Strategy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon