The Effect of Ambiguity of Quality Performance Contractors on Active and Passive Opportunities; Mediation Efforts with Contract Design and Application
In a project, opportunistic behavior has a negative impact on both relations and project success. This opportunistic behavior is often influenced by quality performance ambiguity, where the more ambiguous the quality of the work, the higher opportunistic behavior will occur. One of the ways to mitigate this opportunistic behavior is through detailed contract design and contract implementation. However, it is known that opportunistic behavior can be categorized into two types which are active and passive opportunistic behavior with each having different impacts on the project. A questionnaire-survey of 81 project manager was undertaken in Java and Bali Island. The results showed that quality performance ambiguity has significant impact to increase active and passive opportunistic behavior, for detailed contract design it is not significantly influential to reduce the nature of active opportunism, but has a significant effect on the nature of passive opportunism, and in the ineffective contract application shows no significant increase in active opportunism but has a significant effect on increasing the passive opportunism of contractors. The mediation result showed that detailed contract design can’t yet be used as a reference to reduce passive opportunism if there is quality performance ambiguity. There will still be opportunistic traits for contractors if there is quality performance ambiguity even though the contracts have been designed in detail.
Authors
- Talitha Gustiyana
Publication Details
- Journal
- Community Engagement and Emergence Journal (CEEJ)
- Published
- 2026-11-24
- DOI
- https://doi.org/10.37385/ceej.v8i1.12303
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00