Briefing: The quality of statutory inspection reports under the Reservoirs Act
Under the Reservoirs Act 1975 Inspecting Engineers are required to produce reports and Supervising Engineers are required to produce Statements following their inspections or visits. The quality of these documents varies considerably, as a quality review has shown. This note describes some of the key findings of recent quality reviews with the aim of improving the quality and consistency of panel engineer reports.
Authors
- Alan L. Warren (ORCID: https://orcid.org/0000-0001-7869-4581)
Institutions
- Mott MacDonald (United Kingdom) (GB)
Publication Details
- Journal
- Dams and Reservoirs
- Published
- 2026-11-26
- DOI
- https://doi.org/10.1680/jdare.26.01103
- Primary Topic
- Dam Engineering and Safety
- Type
- article
- Field-Weighted Citation Impact
- 0.00