Railway Infrastructure Project Delays: a Bibliometric Analysis and Unified Classification of Contributing Factors

Timely completion of railway projects is affected by numerous interacting organisational, technical, contractual and administrative factors. This study identifies and systematises the main causes of delay through a bibliometric analysis of 32 publications selected from Scopus and a critical review of 41 sources, including additional academic sources identified outside the Scopus dataset and four reports of the Polish Supreme Audit Office (NIK). A total of 683 factor entries were extracted and, after terminological harmonisation, consolidated into 552 unique harmonised factors grouped into 12 categories. The categories containing the largest numbers of unique harmonised factors concerned project organisation and management, contractor performance, administrative decisions and approvals, and design documentation. Railway-specific factors, particularly track possessions and access to operational infrastructure, formed a relatively small category within the developed classification. The proposed classification provides a basis for comparing previous findings and for further empirical research on railway project delays.

Authors

Publication Details

Journal
Civil And Environmental Engineering Reports
Published
2026-11-25
DOI
https://doi.org/10.59440/ceer/242391
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Railway Infrastructure Project Delays: a Bibliometric Analysis and Unified Classification of Contributing Factors

Agnieszka M. Lesniak, Filip Janowiec, Marta Święchowicz
Civil And Environmental Engineering Reports
Construction Project Management and Performance
article

Railway Infrastructure Project Delays: a Bibliometric Analysis and Unified Classification of Contributing Factors

Agnieszka M. Lesniak, Filip Janowiec, Marta Święchowicz
article en

Abstract

Timely completion of railway projects is affected by numerous interacting organisational, technical, contractual and administrative factors. This study identifies and systematises the main causes of delay through a bibliometric analysis of 32 publications selected from Scopus and a critical review of 41 sources, including additional academic sources identified outside the Scopus dataset and four reports of the Polish Supreme Audit Office (NIK). A total of 683 factor entries were extracted and, after terminological harmonisation, consolidated into 552 unique harmonised factors grouped into 12 categories. The categories containing the largest numbers of unique harmonised factors concerned project organisation and management, contractor performance, administrative decisions and approvals, and design documentation. Railway-specific factors, particularly track possessions and access to operational infrastructure, formed a relatively small category within the developed classification. The proposed classification provides a basis for comparing previous findings and for further empirical research on railway project delays.

Civil And Environmental Engineering ReportsVol. 36(4)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon