Generative Structural Theory v2.6 -- The Exact Fixed Auxiliary Arc Minimum at Arm Length Four

For a tree with k arms of length four meeting at a hub, how many auxiliary arcs must be fixed in advance to reach the bidirected tree? A prescribed start contains a directed cycle through all leaves, one intact bidirected arm, and one missing pair of opposite tree arcs on each remaining arm. Auxiliary endpoints are unrestricted. Each move preserves inclusion-minimal strong connectivity on the full vertex set, deletes at most two arcs, and may add any available arcs. The minimum is b(3,4) = 1 and b(k,4) = 1 + ⌈k/4⌉ for every k ≥ 4. For each k, a single minimum pool serves every prescribed start. The limiting ratio of the minimum pool size to the arm count is 1/4. Four labelled chains on nine through twelve arms each take 22 moves. A seven-move segment of the twelve-arm chain extends the construction by four arms at the cost of one more fixed auxiliary arc. Writing k = s + 4h with s in {9, 10, 11, 12} and h ≥ 0 gives a chain of 22 + 7h moves from the representative start. The construction attains the lower bound proved in v2.5. At sixteen arms (65 vertices), five fixed arcs suffice in 29 moves from the representative start and in at most 44 moves from any prescribed start. The shortest chain length remains open. The archive includes the four seed chains, the sixteen-arm certificate, and a constructor for every k ≥ 9. Two implementations agree on all 650 state visits in 17 finite examples, covering 633 moves and 121,334 single-arc deletion tests.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-25
DOI
https://doi.org/10.5281/zenodo.24506153
Primary Topic
Advanced Graph Theory Research
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Generative Structural Theory v2.6 -- The Exact Fixed Auxiliary Arc Minimum at Arm Length Four

Koji Okino
Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
preprint

Generative Structural Theory v2.6 -- The Exact Fixed Auxiliary Arc Minimum at Arm Length Four

Koji Okino
preprint en

Abstract

For a tree with k arms of length four meeting at a hub, how many auxiliary arcs must be fixed in advance to reach the bidirected tree? A prescribed start contains a directed cycle through all leaves, one intact bidirected arm, and one missing pair of opposite tree arcs on each remaining arm. Auxiliary endpoints are unrestricted. Each move preserves inclusion-minimal strong connectivity on the full vertex set, deletes at most two arcs, and may add any available arcs. The minimum is b(3,4) = 1 and b(k,4) = 1 + ⌈k/4⌉ for every k ≥ 4. For each k, a single minimum pool serves every prescribed start. The limiting ratio of the minimum pool size to the arm count is 1/4. Four labelled chains on nine through twelve arms each take 22 moves. A seven-move segment of the twelve-arm chain extends the construction by four arms at the cost of one more fixed auxiliary arc. Writing k = s + 4h with s in {9, 10, 11, 12} and h ≥ 0 gives a chain of 22 + 7h moves from the representative start. The construction attains the lower bound proved in v2.5. At sixteen arms (65 vertices), five fixed arcs suffice in 29 moves from the representative start and in at most 44 moves from any prescribed start. The shortest chain length remains open. The archive includes the four seed chains, the sixteen-arm certificate, and a constructor for every k ≥ 9. Two implementations agree on all 650 state visits in 17 finite examples, covering 633 moves and 121,334 single-arc deletion tests.

Zenodo (CERN European Organization for Nuclear Research)
Advanced Graph Theory Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon