Integrated Field Control Protocol for Disaster Recovery Works on Transportation Infrastructure (IFCP-DR)
Recovery of transportation infrastructure after hurricanes, floods and landslides combines evolving scope,weather variability, work under traffic and public funding that requires a reliable record of what was done, what itcost and why. U.S. oversight bodies have documented weaknesses precisely in this layer: undocumenteddecisions, contractor performance not recorded, invoices that do not match contract terms and permanent repairsdelayed by design changes and construction delays. The IFCP-DR is a method for managing the execution ofthese works. It follows one operational logic (field, control, management, evidence and learning) and is organizedin three levels: essential controls, mandatory in every contract; a management routine; and improvement toolsapplied when needed. It integrates project management practice (PMBOK Guide, 8th edition, the ten knowledgeareas of the 6th edition and the Construction Extension), Lean Six Sigma and statistical process control, and fielddocumentation practice. It defines a six-phase lifecycle with six control gates, a traceability chain with a procedurefor pending evidence, a change control flow, twelve field record templates, an indicator dictionary with limitations,statistical rules for reading variation, a toolkit tied to the decisions it supports, management routines, fourimplementation stages with criteria for the pilot, its evaluation and expansion, a maturity model, a trainingcurriculum, a validation matrix, a contractual authority matrix, a worked example with filled records and analignment matrix that separates official requirements and audit findings from the internal controls of the protocol. Itderives from the emergency recovery of a mountain highway in Brazil, documented in an open access case study
Authors
- Emanuel Augusto Valle (ORCID: https://orcid.org/0009-0003-0052-0778)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-24
- DOI
- https://doi.org/10.5281/zenodo.24529697
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00