Fuel usage rates and contractor bid pricing in highway construction: a case study

Fuel price volatility complicates cost estimation, bid pricing and program budgeting in highway construction. Although fuel price adjustment clauses are widely used, little is known about whether contract-item fuel usage rates are reflected in contractors’ submitted unit bid prices. This study examines the association between fuel usage rates and submitted unit bid prices and whether this association varies with fuel price volatility measured over periods before bid opening. The sample contains 96,784 contract item observations from 2,101 proposals submitted by 183 bidders for 662 Idaho Transportation Department contracts let between 2017 and 2025. Prices are compared within bidder proposals and among items in the same category and pay unit, while recurring item groups are used to examine the volatility interaction across proposals. Results show that higher fuel usage rates are associated with higher submitted unit bid prices within the same bidder proposal, item category and pay unit. For the primary 12-month volatility measurement period, the estimated coefficient for the association between the fuel usage rate and submitted unit bid price at median fuel price volatility is 0.395, with a 95% confidence interval from 0.263 to 0.526. The analysis provides no clear evidence that this association varies with fuel price volatility measured over the primary 12-month period. Positive interactions with confidence intervals excluding zero appear when volatility is measured over an alternative 18-month period in two of three models. The findings can inform closer review of historical unit prices for contract items with higher fuel usage rates during engineer estimate preparation.

Authors

Institutions

Publication Details

Journal
Construction Management and Economics
Published
2026-11-25
DOI
https://doi.org/10.1080/01446193.2026.2761907
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Fuel usage rates and contractor bid pricing in highway construction: a case study

Abdolmajid Erfani, Mohsen Naghdi
Construction Management and Economics
Construction Project Management and Performance
article

Fuel usage rates and contractor bid pricing in highway construction: a case study

Abdolmajid Erfani, Mohsen Naghdi
article en

Abstract

Fuel price volatility complicates cost estimation, bid pricing and program budgeting in highway construction. Although fuel price adjustment clauses are widely used, little is known about whether contract-item fuel usage rates are reflected in contractors’ submitted unit bid prices. This study examines the association between fuel usage rates and submitted unit bid prices and whether this association varies with fuel price volatility measured over periods before bid opening. The sample contains 96,784 contract item observations from 2,101 proposals submitted by 183 bidders for 662 Idaho Transportation Department contracts let between 2017 and 2025. Prices are compared within bidder proposals and among items in the same category and pay unit, while recurring item groups are used to examine the volatility interaction across proposals. Results show that higher fuel usage rates are associated with higher submitted unit bid prices within the same bidder proposal, item category and pay unit. For the primary 12-month volatility measurement period, the estimated coefficient for the association between the fuel usage rate and submitted unit bid price at median fuel price volatility is 0.395, with a 95% confidence interval from 0.263 to 0.526. The analysis provides no clear evidence that this association varies with fuel price volatility measured over the primary 12-month period. Positive interactions with confidence intervals excluding zero appear when volatility is measured over an alternative 18-month period in two of three models. The findings can inform closer review of historical unit prices for contract items with higher fuel usage rates during engineer estimate preparation.

Construction Management and Economics
Michigan Technological University (US)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon