Soil–infrastructure interaction during stone column installation adjacent to an operational railway

Introduction: Stone column installation by vibro-replacement can displace saturated soft ground and affect adjacent operational infrastructure. Published field evidence concerning horizontal railway track response during installation remains limited. Materials and methods: This paper examines stone column installation on the descending-track side (VD, from the Portuguese Via Descendente) adjacent to an operational double-track railway in Alfarelos, Portugal. Preserved VibroReports, manual rail-target topography, track geometry verification records (VPGV, from the Portuguese Verificação dos Parâmetros Geométricos de Via), field observations, and dated maintenance interventions were placed on a shared timeline. Topographic values were treated as cumulative relative to their applicable baseline and were distinguished from changes between observations and from relative track geometry parameters. Results: At target P-3 on the exterior rail of the descending track, the cumulative planimetric magnitude increased from 30.05 mm on 22 May 2026 to 34.97 mm on 26 May, relative to the 24 April baseline. The increase in reported magnitude over that interval was 4.92 mm. A value of 27.17 mm was recorded on 27 May, the date of a documented track intervention. The preserved VPGV sheets document gauge and cross-level but do not provide a corresponding horizontal-alignment series. Groundwater exsurgences, release of air, and local transport of fines were observed qualitatively during the works. Conclusions: The combined records show temporally overlapping construction activity, cumulative rail-target movement, track geometry variation, and maintenance interventions, but do not support attribution of the approximately 35 mm cumulative value to a single stone column. The case demonstrates the practical need to report measurement reference, direction, accumulated and incremental change, target location, execution chronology, and track intervention together when ground improvement is performed beside an operational railway.

Authors

Publication Details

Journal
Academia Engineering
Published
2026-11-25
DOI
https://doi.org/10.20935/acadeng8626
Primary Topic
Railway Engineering and Dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Soil–infrastructure interaction during stone column installation adjacent to an operational railway

Manuel Anselmo Figueiredo Gomes Vieira
Academia Engineering
Railway Engineering and Dynamics
article

Soil–infrastructure interaction during stone column installation adjacent to an operational railway

Manuel Anselmo Figueiredo Gomes Vieira
article en

Abstract

Introduction: Stone column installation by vibro-replacement can displace saturated soft ground and affect adjacent operational infrastructure. Published field evidence concerning horizontal railway track response during installation remains limited. Materials and methods: This paper examines stone column installation on the descending-track side (VD, from the Portuguese Via Descendente) adjacent to an operational double-track railway in Alfarelos, Portugal. Preserved VibroReports, manual rail-target topography, track geometry verification records (VPGV, from the Portuguese Verificação dos Parâmetros Geométricos de Via), field observations, and dated maintenance interventions were placed on a shared timeline. Topographic values were treated as cumulative relative to their applicable baseline and were distinguished from changes between observations and from relative track geometry parameters. Results: At target P-3 on the exterior rail of the descending track, the cumulative planimetric magnitude increased from 30.05 mm on 22 May 2026 to 34.97 mm on 26 May, relative to the 24 April baseline. The increase in reported magnitude over that interval was 4.92 mm. A value of 27.17 mm was recorded on 27 May, the date of a documented track intervention. The preserved VPGV sheets document gauge and cross-level but do not provide a corresponding horizontal-alignment series. Groundwater exsurgences, release of air, and local transport of fines were observed qualitatively during the works. Conclusions: The combined records show temporally overlapping construction activity, cumulative rail-target movement, track geometry variation, and maintenance interventions, but do not support attribution of the approximately 35 mm cumulative value to a single stone column. The case demonstrates the practical need to report measurement reference, direction, accumulated and incremental change, target location, execution chronology, and track intervention together when ground improvement is performed beside an operational railway.

Academia EngineeringVol. 3(4)
Railway Engineering and Dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon