Beyond Point Accuracy: Multi-Step Wind Power Forecasting and Two-Hour Ramp-Risk Early Warning: A Data-Driven Case Study
Wind-power forecasting accuracy and ramp-risk warning may favor different models. We evaluate eight-step (two-hour) trajectories from 24-h histories using 35,040 observations at 15-min resolution from a publicly shared 2019 wind-farm dataset associated with Xinjiang, China. Fourteen input channels, a January–August/September–October/November–December chronological train/validation/test split, train-fitted scaling, and five-seed model comparisons are used. At the 20 MW absolute ramp criterion, DLinear provides the highest mean R2 (0.8645) and lowest RMSE (25.10 MW), whereas iTransformer provides the highest window-level Average Precision (0.338, compared with event prevalence 0.158) and the lowest MAE among learnable models (14.77 MW). Persistence attains the lowest overall MAE (13.44 MW). Additional analysis shows that iTransformer has lower MAE in 4847 ordinary windows (9.99 versus 11.62 MW for DLinear), but DLinear has lower MAE in 906 ramp-positive windows (38.30 versus 40.37 MW). Thresholded auxiliary heads alter F1 without consistently improving ranking. A retrospective sensitivity analysis illustrates the impact of assumed false-alarm and missed-ramp costs. The single-site setting, two residual sentinel-coded meteorological records, and incomplete upstream cleaning provenance limit reproducibility and transferability claims. Regression accuracy, ramp-window ranking, and alarm decisions should therefore be assessed separately.
Authors
- Weiqing Wang
- Haoxuan Dong
Institutions
- Xinjiang University (CN)
Publication Details
- Journal
- Energies
- Published
- 2026-11-24
- DOI
- https://doi.org/10.3390/en19235708
- Primary Topic
- Energy Load and Power Forecasting
- Type
- article
- Field-Weighted Citation Impact
- 0.00