When is it too late to investigate? A finite-capacity model of structural correction

A system can remain well below its failure threshold while losing the time needed to diagnose and correct a recurring defect. We construct a two-defect model in which observation, repair and routine processing draw on the same budget. For a specified nine-observation policy, safe recovery has probability 0.98041856 for either defect against every permitted disturbance. Under logistic forcing, one round of prior suppression preserves this guarantee. Two rounds can destroy it while the backlog stands at only 7.5 units out of 55. An alternative repair rule changes the result sharply. If incorrect interventions are harmless and retries are available, trying both targets guarantees recovery without observations. The model separates the deadline for an evidence-based intervention from the deadline for system failure and identifies the intervention assumption that gives diagnosis its value.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-24
DOI
https://doi.org/10.5281/zenodo.24496191
Primary Topic
Reliability and Maintenance Optimization
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

When is it too late to investigate? A finite-capacity model of structural correction

Matthew Thomas Quartermain
2 links
Zenodo (CERN European Organization for Nuclear Research)
Reliability and Maintenance Optimization
preprint

When is it too late to investigate? A finite-capacity model of structural correction

Matthew Thomas Quartermain
preprint en

Abstract

A system can remain well below its failure threshold while losing the time needed to diagnose and correct a recurring defect. We construct a two-defect model in which observation, repair and routine processing draw on the same budget. For a specified nine-observation policy, safe recovery has probability 0.98041856 for either defect against every permitted disturbance. Under logistic forcing, one round of prior suppression preserves this guarantee. Two rounds can destroy it while the backlog stands at only 7.5 units out of 55. An alternative repair rule changes the result sharply. If incorrect interventions are harmless and retries are available, trying both targets guarantees recovery without observations. The model separates the deadline for an evidence-based intervention from the deadline for system failure and identifies the intervention assumption that gives diagnosis its value.

Zenodo (CERN European Organization for Nuclear Research)
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
When is it too late to investigate? A finite-capacity model of structural correction — Matthew Thomas Quartermain · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS