Stage-Gates, Pull Planning, and KPIs for the Reduction of Rework in Commercial Space Management
The retail shopfitting industry operates under intense pressure from fixed commercial opening dates, high client variability, and fragmented information flows between design, manufacturing, and site installation. These conditions frequently result in documentation errors and on-site rework, which historically accounted for 68 % of operational impact in technical offices. This study designs and validates a hybrid methodology that integrates Concurrent Engineering principles with Lean Construction tools to improve the traceability of client requirements and reduce rework in commercial space management. The approach was structured around four sequential phases Planning, Detailed Engineering and Document Control, Execution and On-Site Assembly, and Closure and Evaluation and operationalized through stage-gates, reverse pull planning, technical checklists, change-control boards, and four key performance indicators: Percentage of Plan Complete (PPC), Technical Deliverables Quality Index (ICET), Person-Days Deviation Index, and Site Incidence Index (IIS). Validation was conducted through partial implementation in the pilot project of the Oysho Ánima Los Cabos store. Results showed a PPC of 71.43 %, an ICET of 81 %, a person-days deviation of +9.38 %, and a global IIS of 14.38 %. Five of the seven furniture families recorded zero incidences, and 85.7 % of all site non-conformities were traced to inadequate packing of an imported batch rather than local design or manufacturing failures. The methodology made external variability visible, filtered documentation errors before production, protected the fixed opening date, and generated organizational learning without requiring costly enterprise systems. The findings demonstrate that a low-cost, visually managed hybrid framework is practical and effective for professionalizing technical offices in the retail fixture sector. The study contributes an applied model adapted to high-variability commercial environments and provides a foundation for multi-project replication and longitudinal measurement of warranty reduction.
Authors
- Enrique de Jesús Mohedano Torres (ORCID: https://orcid.org/0000-0002-0219-5038)
- Gloria Sandoval Méndez
- Jacqueline Galindo García
- Pedro Alberto Piñón Dominguez
- Cristi Lucero Maldonado Alvarado
- Raúl Joasim Mercado Verde
Institutions
- Instituto Tecnológico de Mérida (MX)
- Instituto Tecnológico de Toluca (MX)
- Tecnológico Nacional de México, Campus Pachuca (MX)
Publication Details
- Journal
- International Journal of Research and Innovation in Social Science
- Published
- 2026-11-24
- DOI
- https://doi.org/10.47772/ijriss.2026.102500034
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00