Project Size, Borrower Type, and Financing Intensity: Evidence from the New Development Bank

The New Development Bank (NDB), established by Brazil, Russia, India, China, and South Africa (BRICS), has become a significant source of infrastructure finance in emerging economies. Yet the determinants of how intensively the Bank participates in individual projects remain insufficiently studied. This paper examines the association between project characteristics and NDB financing intensity, defined as the share of total project cost financed by the Bank, using project-level data on 88 NDB-financed infrastructure projects across the five founding BRICS countries approved between 2016 and 2026. The analytical sample comprises 64 sovereign and 24 non-sovereign projects. The study estimates ordinary least squares models with heteroskedasticity-consistent (HC3) standard errors, relating financing intensity to project scale and sovereign status while controlling for country and financing-approval period, and complements the share specification with a log–log model of absolute NDB financing and a fractional-response robustness specification. The results indicate that NDB financing increases with project size in absolute terms, but less than proportionally: the estimated elasticity of NDB financing with respect to total project cost is approximately 0.48, and the hypothesis of proportional scaling is strongly rejected (t = −7.60, p < 0.001). Larger projects therefore receive larger absolute commitments while accounting for a declining share of total project cost. Sovereign projects receive financing shares approximately 29 percentage points higher than non-sovereign projects, conditional on project size, country, and approval period. These associations remain stable across robustness specifications, including sector controls, exclusion of influential observations, and alternative sample restrictions. Because the design is observational and conditional on approved projects, the results are interpreted as conditional associations rather than causal effects.

Authors

Institutions

Publication Details

Journal
Journal of risk and financial management
Published
2026-11-24
DOI
https://doi.org/10.3390/jrfm19120951
Primary Topic
International Development and Aid
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Project Size, Borrower Type, and Financing Intensity: Evidence from the New Development Bank

Igor A. Mayburov, Subhodeep Dasgupta
2 links
Journal of risk and financial management
International Development and Aid
article

Project Size, Borrower Type, and Financing Intensity: Evidence from the New Development Bank

Igor A. Mayburov, Subhodeep Dasgupta
article en

Abstract

The New Development Bank (NDB), established by Brazil, Russia, India, China, and South Africa (BRICS), has become a significant source of infrastructure finance in emerging economies. Yet the determinants of how intensively the Bank participates in individual projects remain insufficiently studied. This paper examines the association between project characteristics and NDB financing intensity, defined as the share of total project cost financed by the Bank, using project-level data on 88 NDB-financed infrastructure projects across the five founding BRICS countries approved between 2016 and 2026. The analytical sample comprises 64 sovereign and 24 non-sovereign projects. The study estimates ordinary least squares models with heteroskedasticity-consistent (HC3) standard errors, relating financing intensity to project scale and sovereign status while controlling for country and financing-approval period, and complements the share specification with a log–log model of absolute NDB financing and a fractional-response robustness specification. The results indicate that NDB financing increases with project size in absolute terms, but less than proportionally: the estimated elasticity of NDB financing with respect to total project cost is approximately 0.48, and the hypothesis of proportional scaling is strongly rejected (t = −7.60, p < 0.001). Larger projects therefore receive larger absolute commitments while accounting for a declining share of total project cost. Sovereign projects receive financing shares approximately 29 percentage points higher than non-sovereign projects, conditional on project size, country, and approval period. These associations remain stable across robustness specifications, including sector controls, exclusion of influential observations, and alternative sample restrictions. Because the design is observational and conditional on approved projects, the results are interpreted as conditional associations rather than causal effects.

Journal of risk and financial managementVol. 19(12)
Ural Federal University (RU), Financial University (RU)
Partnerships for the goals, Industry, innovation and infrastructure
International Development and Aid
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon